COOLGAP
Live / Registered — Registered (as of 06 Jun 2023)
What this means for you
Registered since 06 Jun 2023. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79330665
- Registration number
- 7070654
- Mark type
- Design + words
- Filed
- 19 Nov 2021
- Published for opposition
- 21 Mar 2023
- Registered
- 06 Jun 2023
- Attorney of record
- Vivian Ortiz-Ponce
Goods and services
- Class 001 — Chemicals: Filled unprocessed artificial resins for manufacture of electrical winding covers; conductive unprocessed artificial resins; unprocessed polyurethane resins; unprocessed epoxy resins; unprocessed silicone resin; unprocessed synthetic resins; synthetic resin compounds in the form of microspheres used for incorporating various other substances, namely, unprocessed synthetic resins; fillings of synthetic resins, namely, unprocessed synthetic resins; unprocessed artificial resins as raw materials in the form of powders, liquids or pastes; unprocessed artificial resins for use in industry
- Class 009 — Scientific and electric apparatus: Electrical transformers; electric batteries; antennas; electric coils; holders for electric coils; electromagnetic coils; chargers for electric batteries; electric apparatus for commutation, namely, current converters; power inverters; chocking coils for use in electrical apparatus, namely, electric coils; magnetic cores; magnetic filaments, namely, magnetic coils; magnetic protectors, namely, magnetic contacts; magnetic filters, namely, magnetic encoders; magnetic sensors, namely, metal detectors; magnetic wires; step-up transformers; telecommunication transmitters; transponders
- Class 017 — Rubber goods: Semi-finished synthetic resins; synthetic insulating material for thermal protection of connections
Owner
Prosecution history
- 19 Sept 2025 — TEAS CHANGE OF CORRESPONDENCE RECEIVED
- 19 Sept 2025 — ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED
- 19 Sept 2025 — TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
- 03 Oct 2023 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 11 Sept 2023 — FINAL DISPOSITION NOTICE SENT TO IB
- 11 Sept 2023 — FINAL DISPOSITION PROCESSED
- 06 Sept 2023 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 06 Jun 2023 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 06 Jun 2023 — REGISTERED-PRINCIPAL REGISTER
- 21 Mar 2023 — NOTIFICATION PROCESSED BY IB
- 21 Mar 2023 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 21 Mar 2023 — PUBLISHED FOR OPPOSITION
- 01 Mar 2023 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 01 Mar 2023 — NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
- 01 Mar 2023 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED