CMB

Live / Registered — Registered (as of 07 Mar 2023)

What this means for you

Registered since 07 Mar 2023. The owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
79330508
Registration number
6993871
Mark type
Design + words
Filed
02 Sept 2021
Published for opposition
20 Dec 2022
Registered
07 Mar 2023
Attorney of record
Ben Natter

Goods and services

  • Class 007 — Machines and machine tools: feeding apparatus, namely, flues for engine boilers; alternators; electric washing machines for industrial purposes; robotic cargo handling machines; wet vacuum cleaners; oil centrifuges; electric compressors; air compressors; fluid separation machines; ejectors for fluid pumping; spin dryers, not heated; electric pump installations; perforated plates being parts of machines for sorting materials; compressed air machines; air suction machines for scavenging purposes; material compacting machines; air suction machines for industrial purposes; extracting machines utilizing solvents for chemical processing; extracting machines for chemical processing; robotic filling machines; pumps for machines; centrifugal pumps; oil drain pumps; sludge pumps; pumps for machines for the extraction of liquids; power-operated basket presses; electric air jet cleaner machines; sorting slides as parts of industrial sorting machines; oil separator machines; fluid pumping installations; power-operated industrial blowers; machines presses for industrial purposes; shredding machines other than paper shredders for offices
  • Class 011 — Environmental control apparatus: Distillation apparatus for industrial use; distillation columns not for scientific purposes; gas scrubbers as parts of gas installations; industrial dryers for heating and dehumidifying; central air-conditioning installations for industrial purposes; thermal incinerators; chemical processing equipment, namely, heat exchangers for chemical processing; industrial cooling installation; heating installations for industrial use; industrial installations for filtering liquids; heating installations for the burning off of liquids; sewage treatment installations; gas scrubbing apparatus and gas purification apparatus; oil purifying installations; reactors being industrial chemical installations; shell heat exchangers not being parts of machines; heat exchangers, other than parts of machines; industrial refining towers for distillation
  • Class 037 — Building construction and repair services: Installation of air conditioning apparatus for use in clean rooms; installation of industrial plants; repair of industrial plants and machinery; repair or maintenance of industrial plants; building construction supervision services for industrial projects; construction supervision of civil engineering projects
  • Class 042 — Scientific and technological services: Safety testing of industrial equipment and plants; testing of machinery; civil engineering consultancy; engineering consultancy relating to design; inspection of plant and machinery; engineering drawing; provision of technological consultancy to the refining industry; surveying; preparation of reports relating to technical project studies; design of industrial buildings; design of industrial plants; conducting technical project studies for industrial construction projects; conducting of quality control tests; advisory services relating to industrial design; architectural and engineering services; quality control testing services for industrial machinery; engineering services for the design of machinery; engineering feasibility studies; technical research in the field of industrial machinery

Owner

Prosecution history

  • 29 Nov 2025 — NEW REPRESENTATIVE AT IB RECEIVED
  • 04 Jul 2023 — FINAL DECISION TRANSACTION PROCESSED BY IB
  • 11 Jun 2023 — FINAL DISPOSITION NOTICE SENT TO IB
  • 11 Jun 2023 — FINAL DISPOSITION PROCESSED
  • 07 Jun 2023 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
  • 07 Mar 2023 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
  • 07 Mar 2023 — REGISTERED-PRINCIPAL REGISTER
  • 21 Dec 2022 — NOTIFICATION PROCESSED BY IB
  • 20 Dec 2022 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 20 Dec 2022 — PUBLISHED FOR OPPOSITION
  • 30 Nov 2022 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
  • 30 Nov 2022 — NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
  • 30 Nov 2022 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 11 Nov 2022 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 11 Nov 2022 — EXAMINER'S AMENDMENT ENTERED

View this trademark record on Marksy