LEAK AWAY
Live / Registered — Registered (as of 09 May 2023)
What this means for you
Registered since 09 May 2023. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79328379
- Registration number
- 7045357
- Mark type
- Design + words
- Filed
- 31 Aug 2021
- Published for opposition
- 21 Feb 2023
- Registered
- 09 May 2023
- Attorney of record
- Wendi E. Sloane
Goods and services
- Class 019 — Non-metallic building materials: Non-metallic building materials, namely, reinforcing materials, plastic, namely, plastic pipe supports, plastic conduits for irrigation and drainage, plastic extrusions, namely, plastic water conduits for roofs and balconies, modular plastic decking to serve as a ground cover, plastic oil and debris trap for storm drainage, plastic webbing material used to reinforce bituminous waterproofing sheets; tubes in the nature of packers for the repair of sewers and drains, namely, lateral packers, flexible packers, pillow packers, T90 packers and stoppers for repairing and patch repairing sewers, pipes and drains; repair kits for sewers, pipes and drains comprised of rubber tubular liners and fabric impregnated with epoxy, used together to repair sewers, pipes and drains
- Class 037 — Building construction and repair services: Repair, renovation, maintenance and cleaning of sewers, pipes and drains; information, advisory and consultancy services relating to the aforesaid services
Owner
- MFC International Limited, Kent, GB
- MFC International Limited, Kent, GB
- MFC International Limited, Kent, GB
Prosecution history
- 28 May 2024 — NOTICE OF UPDATED REGISTRATION CONFIRMATION EMAILED
- 24 Apr 2024 — CORRECTION UNDER SECTION 7 - PROCESSED
- 22 Apr 2024 — TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED
- 16 Apr 2024 — POST REGISTRATION ACTION MAILED - SEC. 7
- 08 Apr 2024 — CASE ASSIGNED TO POST REGISTRATION PARALEGAL
- 04 Sept 2023 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 23 Aug 2023 — TEAS SECTION 7 REQUEST RECEIVED
- 14 Aug 2023 — FINAL DISPOSITION NOTICE SENT TO IB
- 14 Aug 2023 — FINAL DISPOSITION PROCESSED
- 09 Aug 2023 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 16 Jul 2023 — POST REGISTRATION ACTION MAILED NO RESPONSE REQUIRED
- 13 Jul 2023 — CASE ASSIGNED TO POST REGISTRATION PARALEGAL
- 22 Jun 2023 — TEAS VOLUNTARY AMENDMENT RECEIVED
- 09 May 2023 — REGISTERED-PRINCIPAL REGISTER
- 09 May 2023 — NOTICE OF REGISTRATION CONFIRMATION EMAILED