KALESINTERFLEX T-ONE BY KALE
Dead / Abandoned — Abandoned — failure to respond (as of 19 Oct 2022)
What this means for you
This application is over — abandoned 07 Oct 2022. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.
Record
- Serial number
- 79323250
- Mark type
- Slogan / phrase
- Filed
- 11 Jun 2021
- Abandoned
- 07 Oct 2022
Goods and services
- Class 019 — Non-metallic building materials: Sand, gravel, crushed stone, asphalt, bitumen, cement, gypsum, plaster, concrete, marble blocks for construction, included in this class; building materials (as finished products) made of concrete, gypsum, clay, potters' clay, stone, marble, wood, plastics and synthetic materials for building, construction, road construction purposes, included in this class; non-metallic buildings, non-metallic building materials, poles not of metal for power lines, barriers not of metal; natural and synthetic coatings in the form of panels and sheets, being building materials; bitumen cardboard coatings for roofing; bitumen coating for roofing; doors and windows of wood and synthetic materials; traffic signs not of metal, non-luminous and non-mechanical, for roads; monuments and statuettes of stone, concrete and marble; building glass; prefabricated swimming pools not of metal (structures); aquarium sand
Owner
Prosecution history
- 18 Sept 2025 — CHANGE OF NAME/ADDRESS REC'D FROM IB
- 12 Nov 2023 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 20 Oct 2023 — FINAL DISPOSITION NOTICE SENT TO IB
- 19 Oct 2023 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 12 Apr 2023 — NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
- 23 Mar 2023 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 22 Mar 2023 — NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
- 19 Oct 2022 — ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
- 19 Oct 2022 — ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
- 19 Oct 2022 — ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
- 25 Apr 2022 — REFUSAL PROCESSED BY IB
- 06 Apr 2022 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 06 Apr 2022 — REFUSAL PROCESSED BY MPU
- 08 Mar 2022 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 07 Mar 2022 — NON-FINAL ACTION WRITTEN