NEXANS ELECTRIFY THE FUTURE
Live / Registered — Registered (as of 21 Jun 2022)
What this means for you
Registered since 21 Jun 2022. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79321981
- Registration number
- 6763010
- Mark type
- Stylized text
- Filed
- 11 Jun 2021
- Published for opposition
- 05 Apr 2022
- Registered
- 21 Jun 2022
- Attorney of record
- CHAI IM
Goods and services
- Class 004 — Lubricants and fuels: Electrical energy
- Class 009 — Scientific and electric apparatus: Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling the distribution or use of electricity; Downloadable software for conducting, switching, transforming, accumulating, regulating or controlling the distribution or use of electricity
- Class 037 — Building construction and repair services: Construction, repair, maintenance and installation services in the fields of infrastructure for transport of electrical energy, electric networks; consultation services relating to construction, repair, maintenance and installation of infrastructure for transport of electrical energy, electric networks
- Class 039 — Transportation and storage services: Storage, distribution, transport, shipping and delivery of equipment and cables for transport and distribution of electrical energy, for electric networks; consultation and advisory services in the fields of transport and distribution of electric energy, electric networks; storage, distribution, transport of electrical energy
- Class 042 — Scientific and technological services: Engineering services in the fields of conducting, switching, transforming, accumulating, regulating or controlling the distribution or use of electricity; design of software in the fields of conducting, switching, transforming, accumulating, regulating or controlling the distribution or use of electricity
Owner
Prosecution history
- 05 Apr 2024 — NEW REPRESENTATIVE AT IB RECEIVED
- 25 Oct 2022 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 04 Oct 2022 — FINAL DISPOSITION NOTICE SENT TO IB
- 04 Oct 2022 — FINAL DISPOSITION PROCESSED
- 21 Sept 2022 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 21 Jun 2022 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 21 Jun 2022 — REGISTERED-PRINCIPAL REGISTER
- 05 Apr 2022 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 05 Apr 2022 — PUBLISHED FOR OPPOSITION
- 16 Mar 2022 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 03 Mar 2022 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 24 Feb 2022 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 24 Feb 2022 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 24 Feb 2022 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 19 Dec 2021 — REFUSAL PROCESSED BY IB