ADDA CONSTRUCT
Live / Registered — Registered (as of 30 Aug 2022)
What this means for you
Registered since 30 Aug 2022. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79313298
- Registration number
- 6829706
- Mark type
- Stylized text
- Filed
- 24 May 2021
- Published for opposition
- 14 Jun 2022
- Registered
- 30 Aug 2022
Goods and services
- Class 009 — Scientific and electric apparatus: Downloadable or recorded application software for use in computer-aided design, estimating resource requirements, management of manufacturing processes and engineering design; Downloadable or recorded computer programs for use in computer-aided design; Downloadable or recorded computer software designed to estimate resource requirements; Downloadable or recorded computer programs for the management of the manufacturing processes; Downloadable or recorded engineering design software
- Class 042 — Scientific and technological services: Software as a service (SAAS) featuring software for use in computer-aided design, estimating resource requirements, management of manufacturing processes and engineering design; Software engineering services; Industrial design; Advisory services relating to industrial design; Provision of information relating to industrial design; Advisory services relating to building design; Commercial building design services; Design services relating to civil engineering; Computer software design; Advisory services relating to computer software; Construction drafting
Owner
Prosecution history
- 16 Jan 2025 — CHANGE OF NAME/ADDRESS REC'D FROM IB
- 15 Jan 2023 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 08 Dec 2022 — GENERIC MADRID TRANSACTION SENT TO IB
- 08 Dec 2022 — GENERIC MADRID TRANSACTION CREATED
- 30 Nov 2022 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 30 Aug 2022 — REGISTERED-PRINCIPAL REGISTER
- 21 Aug 2022 — CHANGE OF NAME/ADDRESS REC'D FROM IB
- 14 Jun 2022 — PUBLISHED FOR OPPOSITION
- 25 May 2022 — NOTICE OF PUBLICATION
- 11 May 2022 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 06 May 2022 — ASSIGNED TO EXAMINER
- 29 Apr 2022 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 29 Apr 2022 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 29 Apr 2022 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 30 Jan 2022 — REFUSAL PROCESSED BY IB