AURUBIS
Dead / Abandoned — Abandoned — failure to respond (as of 25 Apr 2022)
What this means for you
This application is over — abandoned 11 Apr 2022. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.
Record
- Serial number
- 79308061
- Mark type
- Design + words
- Filed
- 10 Mar 2021
- Abandoned
- 11 Apr 2022
Goods and services
- Class 001 — Chemicals: Chemicals used in industry, science and photography, as well as in agriculture, horticulture and forestry; unprocessed artificial resins, unprocessed plastics; fertilizers; fire extinguishing compositions; tempering and soldering preparations; chemical substances for preserving foodstuffs; tanning substances; adhesives used in industry
- Class 006 — Metal goods: Common metals and their alloys; copper; copper profiles, copper sheets, copper plates, copper wires; metal building materials; materials of metal for buildings; materials of metal for railway tracks, non-electric cables and wires; transportable buildings made of metal; rails made of metal; ironmongery, small items of metal hardware; pipes and tubes of metal; safes; goods of common metal, included in this class; ores
- Class 014 — Jewelry: Precious metals and their alloys and goods in precious metals or coated therewith (as far as included in this class); jewellery, precious stones; horological and chronometric instruments
- Class 040 — Treatment of materials: Material treatment and material processing of ores and ore concentrates; bookbinding; photographic film development and photographic printing; lithographic printing; printing; offset printing; photocomposing services; silkscreen printing; leather tanning, leather dying, leather assembling; leather processing; metal tempering; metal processing; enameling; electroplating; galvanization; phosphorization; chromium plating; zinc plating; sorting of waste and recyclable material
- Class 042 — Scientific and technological services: Scientific and technological services and research and corresponding design services; industrial analysis and research services; design and development of computer hardware and computer software; building and construction drafting and consultancy relating thereto; service of an architecture; service of a chemist; services of an engineer; services of a chemical laboratory; services of an physicist; storing of computer software in computer databanks, electronical storing of computer software; installation and maintenance of computer software; development of computer software; updating of computer software; rental of computer software; updating of databank software; surveying; technical consultancy and technical expert opinion services; scientific research for third parties; industrial research for third parties; computer rental; online services, namely, providing of databanks, development, design and hosting of computer sites; materials testing; services of engineers in the field of technical analysis for science and technology (valuation, appraisals, investigation and reports); scientific research for medical purposes; technical development of production plants, machinery and apparatus for the processing of ores, the production and the processing of metals and for the protection of the environment
Owner
- Aurubis AG, XP
Prosecution history
- 16 May 2023 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 25 Apr 2023 — FINAL DISPOSITION NOTICE SENT TO IB
- 25 Apr 2023 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 26 Sept 2022 — NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
- 07 Sept 2022 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 07 Sept 2022 — NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
- 25 Apr 2022 — ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
- 25 Apr 2022 — ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
- 25 Apr 2022 — ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
- 08 Nov 2021 — REFUSAL PROCESSED BY IB
- 08 Oct 2021 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 08 Oct 2021 — REFUSAL PROCESSED BY MPU
- 07 Oct 2021 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 06 Oct 2021 — NON-FINAL ACTION WRITTEN
- 06 Oct 2021 — ASSIGNED TO EXAMINER