I GDI

Dead / Abandoned — Abandoned — failure to respond (as of 07 Mar 2022)

What this means for you

This application is over — abandoned 25 Feb 2022. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.

Record

Serial number
79304567
Mark type
Design + words
Filed
15 Jan 2021
Abandoned
25 Feb 2022

Goods and services

  • Class 011 — Environmental control apparatus: Sanitary apparatus and installations for bathrooms and plumbing fixtures; bath installations; bathtub enclosures; bath taps; toilet bowls; sitz baths; bath apparatus; washbasins for bathrooms; outdoor showers for bathing; bath seats for bathtubs; transportable booths for Turkish baths; bath tubs for sitz baths; massage bath accessories; pedestals for bathroom washbasins; saunas; steam baths and spas (installations)
  • Class 019 — Non-metallic building materials: Non-metallic building materials; rigid pipes, not of metal, for building; asphalt, pitch and bitumen; transportable buildings, not of metal; monuments, not of metal; especially ceramic and stoneware tiles, pavings and linings and tiles for construction not of metal
  • Class 020 — Furniture: Furniture, mirrors and picture frames; worktops for sinks, worktops (parts of furniture); containers not of metal for storage or transport; bone, horn, whalebone or mother-of-pearl, unwrought or semi-wrought; shells; meerschaum; yellow amber

Owner

Prosecution history

  • 29 Mar 2023 — FINAL DECISION TRANSACTION PROCESSED BY IB
  • 07 Mar 2023 — FINAL DISPOSITION NOTICE SENT TO IB
  • 07 Mar 2023 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
  • 08 Aug 2022 — NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
  • 20 Jul 2022 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
  • 20 Jul 2022 — NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
  • 07 Mar 2022 — ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
  • 07 Mar 2022 — ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
  • 07 Mar 2022 — ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
  • 11 Sept 2021 — REFUSAL PROCESSED BY IB
  • 24 Aug 2021 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
  • 24 Aug 2021 — REFUSAL PROCESSED BY MPU
  • 11 Aug 2021 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
  • 10 Aug 2021 — NON-FINAL ACTION WRITTEN
  • 28 Jul 2021 — ASSIGNED TO EXAMINER

View this trademark record on Marksy