SPINMAG
Live / Registered — Registered (as of 07 Jun 2022)
What this means for you
Registered since 07 Jun 2022. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79304551
- Registration number
- 6749118
- Mark type
- Stylized text
- Filed
- 22 Dec 2020
- Published for opposition
- 01 Feb 2022
- Registered
- 07 Jun 2022
- Attorney of record
- Carl Oppedahl
Goods and services
- Class 017 — Rubber goods: insulating refractory materials; insulating refractory materials, not for buildings, in brick form
- Class 019 — Non-metallic building materials: refractory building materials not of metal in the nature of bricks, blocks, mortars, concrete, cement; refractory bricks, not of metal; refractory blocks not of metal; firebricks, not of metal; refractory furnace linings not of metal; refractory cement; refractory concrete; cement for furnaces; cement for blast furnaces; building materials in the nature of asphalt roof coatings; chimneys not of metal; fired refractory material, not of metal, namely, grog; mantels for fireplaces, not of metal; fireproof cement coatings; chimney cowls, not of metal; chimney pots, not of metal; chimney shafts, not of metal; bricks; construction materials not of metal, namely, fiberglass boards, energy conserving concrete slabs; prefabricated buildings, not of metal; transportable buildings not of metal; veneering, not of metal, for building in the nature of wood and stone veneers; paving slabs, not of metal; tiles not of metal for construction
- Class 042 — Scientific and technological services: engineering services relating to refractory materials and refractory construction materials; research services in the nature of conducting technical project studies relating to refractory materials and refractory construction materials; testing of materials relating to refractory materials and refractory construction materials
Owner
- Duferco SA, CH
- Duferco SA, CH
- Duferco SA, CH
Prosecution history
- 16 Jun 2024 — NEW REPRESENTATIVE AT IB RECEIVED
- 17 Oct 2022 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 23 Sept 2022 — FINAL DISPOSITION NOTICE SENT TO IB
- 22 Sept 2022 — FINAL DISPOSITION PROCESSED
- 07 Sept 2022 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 07 Jun 2022 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 07 Jun 2022 — REGISTERED-PRINCIPAL REGISTER
- 29 Apr 2022 — ELECTRONIC RECORD REVIEW COMPLETE
- 30 Mar 2022 — ON HOLD - ELECTRONIC RECORD REVIEW REQUIRED
- 01 Feb 2022 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 01 Feb 2022 — PUBLISHED FOR OPPOSITION
- 29 Jan 2022 — NOTIFICATION PROCESSED BY IB
- 12 Jan 2022 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 12 Jan 2022 — NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
- 12 Jan 2022 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED