JNHQ

Dead / Abandoned — Abandoned — failure to respond (as of 05 Oct 2021)

What this means for you

This application is over — abandoned 27 Sept 2021. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.

Record

Serial number
79301163
Mark type
Stylized text
Filed
19 Oct 2020
Abandoned
27 Sept 2021

Goods and services

  • Class 006 — Metal goods: Electrical steel sheets; silicon steel sheets; electrical steel sheets for iron core; iron and steel, all being unwrought or semi-wrought; nonferrous metals and their alloys; building and construction materials of metal, namely, metal door frames, steel frames for building, metal window frames, metal greenhouse frames, metal ceiling panels, metal roofing panels, wall panels of metal, metal door panels and metal fence panels; liquid storage tanks of metal; industrial water storage tanks of metal; metal storage tanks; containers of metal for transport; metal hardware, namely, nuts, nails, bolts and wedges of metal; industrial packaging containers of metal; metal junctions for pipes and tubes; metal flanges; loading and unloading pallets of metal; turn-tables of metal for load handling; traversers of metal for load handling

Owner

Prosecution history

  • 22 Sept 2025 — NEW REPRESENTATIVE AT IB RECEIVED
  • 25 Oct 2022 — FINAL DECISION TRANSACTION PROCESSED BY IB
  • 07 Oct 2022 — NEW REPRESENTATIVE AT IB RECEIVED
  • 05 Oct 2022 — FINAL DISPOSITION NOTICE SENT TO IB
  • 05 Oct 2022 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
  • 21 Jun 2022 — NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
  • 01 Jun 2022 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
  • 01 Jun 2022 — NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
  • 02 Nov 2021 — UNDELIVERABLE MAIL - NO ACTION TAKEN
  • 05 Oct 2021 — ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
  • 05 Oct 2021 — ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
  • 13 Apr 2021 — REFUSAL PROCESSED BY IB
  • 24 Mar 2021 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
  • 24 Mar 2021 — REFUSAL PROCESSED BY MPU
  • 23 Mar 2021 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW

View this trademark record on Marksy