AXXERON
Live / Registered — Registered (as of 28 Sept 2021)
What this means for you
Registered since 28 Sept 2021. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79299479
- Registration number
- 6495702
- Mark type
- Stylized text
- Filed
- 03 Aug 2020
- Published for opposition
- 13 Jul 2021
- Registered
- 28 Sept 2021
- Attorney of record
- John Alumit
Goods and services
- Class 007 — Machines and machine tools: Precision machine tools being parts of sets, namely, hard metal tools for use in the cutting and forming of materials by others; cutting tools for machine centres, namely, machine tools for cutting of materials; numerically controlled machining stations for drilling in the nature of drilling machines; installations for use in continuous casting in the nature of casting machines; pressure regulators being parts of machines in lubricating installations; hydroelectric installations for generating electricity; hydraulic motors for excavators; excavators for hydraulic expansion machines; hydraulic excavators; hydraulic wood grippers being machines for forestry use; hydraulic pumps; hydraulic rams being machines; servo-controlled hydraulic pumps; self-propelled hydraulic platforms being elevating work platforms; hydraulic lifting gear being parts for power-operated lifting equipment; hydraulic mobile platforms being elevating work platforms; mechanical and hydraulic lifts; hydraulic conveyors; hydraulic process control instruments being hydraulic valve actuators; hydraulic tools being hydraulically actuated tools, namely, pliers; hydraulic process control units, namely, pump control valves; hydraulic presses for metalworking; couplings of metal for hydraulic machines; hydraulic valves being parts of machines; hydraulic engines and motors; hydraulic linear actuators; clamp connectors for piping being structural parts of machines; pumps for machines; pump installations being pumps for machines; sewage treatment machines, namely, sewage pulverizers being machines; electrical pumps; electrical pumps, electric compressors and power-operated blowers; industrial robots for welding; welding torches; oxyacetylene welding machines; gas welding machines; robotic welding machines; electric welding machines; electric welding and soldering machines and apparatus; laser welding machines; swaging machines for use in the preparation of hose assemblies; current generators; robots for industrial use; road sweeping, steam cleaning, pressure washing and clothes laundering machines; agricultural, earthmoving, construction, oil and gas extraction and mining equipment, namely, mine borers and oil-well pumping machines; machines and machine tools for treatment of materials and for manufacturing, namely, glassware manufacturing machines and lathes for metalworking; emergency and rescue machines and machine tools, namely, emergency power generators; moving and handling equipment, namely, cargo handling machines; food and beverage processing and preparation machines and apparatus, namely, automatic packing machines for food and pumps for the beverage industry; machines, machine tools, and power-operated tools and apparatus, for fastening and joining, namely, vices for use in the precision clamping of work pieces; dispensing machines, namely, for dispensing packing material
Owner
- JB Management GmbH, DE
- JB Management GmbH, DE
- JB Management GmbH, DE
Prosecution history
- 04 Apr 2022 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 16 Mar 2022 — FINAL DISPOSITION NOTICE SENT TO IB
- 16 Mar 2022 — FINAL DISPOSITION PROCESSED
- 28 Dec 2021 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 28 Sept 2021 — REGISTERED-PRINCIPAL REGISTER
- 13 Jul 2021 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 13 Jul 2021 — PUBLISHED FOR OPPOSITION
- 23 Jun 2021 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 09 Jun 2021 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 11 May 2021 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 10 May 2021 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 10 May 2021 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 24 Jan 2021 — REFUSAL PROCESSED BY IB
- 05 Jan 2021 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 05 Jan 2021 — REFUSAL PROCESSED BY MPU