EOLUS
Live / Registered — Registered (as of 22 Feb 2022)
What this means for you
Registered since 22 Feb 2022. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79295516
- Registration number
- 6648761
- Mark type
- Stylized text
- Filed
- 19 Aug 2020
- Published for opposition
- 26 Oct 2021
- Registered
- 22 Feb 2022
- Attorney of record
- Karen Kreider Gaunt
Goods and services
- Class 004 — Lubricants and fuels: Electrical energy; electrical energy from renewable sources; electrical energy from wind power; electrical energy from solar power
- Class 037 — Building construction and repair services: Construction of wind power plants, solar power installations, installations for production of electrical power from renewable sources and energy storage installations; repair and maintenance of wind power plants, solar power installations, installations for production of electrical power from renewable sources; construction of energy storage installations and other buildings; installation services relating to wind power plants, solar power installations, installations for production of electrical power from renewable sources; building construction supervision
- Class 042 — Scientific and technological services: engineering services in the form of conducting technical project studies and engineering project management services regarding building and utilizing wind power plants, solar power installations, installations for production of electrical power from renewable sources and energy storage installations; technological analysis services, namely, engineering services for exploitation of wind power, solar energy, energy from renewable sources and energy storage; design and development of regenerative energy generation systems; technological consulting services in the field of alternative energy generation; technological engineering analysis relating to energy and power needs of others; technical supervision and inspection, namely, providing quality control services in regard to wind power plants and solar power installations
Owner
Prosecution history
- 22 Aug 2022 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 27 Jul 2022 — FINAL DISPOSITION NOTICE SENT TO IB
- 27 Jul 2022 — FINAL DISPOSITION PROCESSED
- 22 May 2022 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 22 Feb 2022 — REGISTERED-PRINCIPAL REGISTER
- 05 Jan 2022 — EXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED
- 22 Nov 2021 — EXTENSION OF TIME TO OPPOSE RECEIVED
- 26 Oct 2021 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 26 Oct 2021 — PUBLISHED FOR OPPOSITION
- 24 Oct 2021 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 20 Oct 2021 — NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
- 06 Oct 2021 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 20 Sept 2021 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 20 Sept 2021 — EXAMINER'S AMENDMENT ENTERED
- 20 Sept 2021 — NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED