GROWCER
Live / Registered — Registered (as of 23 May 2023)
What this means for you
Registered since 23 May 2023. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79284860
- Registration number
- 7057589
- Mark type
- Stylized text
- Filed
- 09 Dec 2019
- Published for opposition
- 07 Mar 2023
- Registered
- 23 May 2023
- Attorney of record
- Sarah Otte Graber
Goods and services
- Class 006 — Metal goods: Metal greenhouse frames; modular metal greenhouses; prefabricated and portable modular metal buildings for use as office workspaces
- Class 011 — Environmental control apparatus: Modular toilets; cold storage containers and walk-in refrigerators within prefabricated modular building structures; commercial kitchen units within prefabricated modular building structures consisting of at least two or more of the following elements: electric and gas stoves and ranges, refrigerators, kitchen sinks, exhaust hoods, water heaters, in addition to storage shelves, packing tables, food processing and packaging machines and dry storage areas; hydroponic growing systems in a closed environment structure comprised of lighting systems, water and nutrient distribution systems, environmental control systems and heating, cooling and ventilation systems
- Class 019 — Non-metallic building materials: Prefabricated and portable modular non-metal buildings for use as office workspaces
- Class 035 — Advertising and business services: Business management consulting not related to grocery stores and grocery store operations
Owner
- The Growcer Inc., CA
- The Growcer Inc., CA
- The Growcer Inc., CA
Prior registrations
Prosecution history
- 12 Sept 2023 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 23 Aug 2023 — FINAL DISPOSITION NOTICE SENT TO IB
- 23 Aug 2023 — FINAL DISPOSITION PROCESSED
- 23 Aug 2023 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 23 May 2023 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 23 May 2023 — REGISTERED-PRINCIPAL REGISTER
- 07 Mar 2023 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 07 Mar 2023 — PUBLISHED FOR OPPOSITION
- 06 Mar 2023 — NOTIFICATION PROCESSED BY IB
- 15 Feb 2023 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 15 Feb 2023 — NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
- 15 Feb 2023 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 29 Jan 2023 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 26 Jan 2023 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 25 Jan 2023 — CORRESPONDENCE RECEIVED IN LAW OFFICE