GROWCER

Live / Registered — Registered (as of 23 May 2023)

What this means for you

Registered since 23 May 2023. The owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
79284860
Registration number
7057589
Mark type
Stylized text
Filed
09 Dec 2019
Published for opposition
07 Mar 2023
Registered
23 May 2023
Attorney of record
Sarah Otte Graber

Goods and services

  • Class 006 — Metal goods: Metal greenhouse frames; modular metal greenhouses; prefabricated and portable modular metal buildings for use as office workspaces
  • Class 011 — Environmental control apparatus: Modular toilets; cold storage containers and walk-in refrigerators within prefabricated modular building structures; commercial kitchen units within prefabricated modular building structures consisting of at least two or more of the following elements: electric and gas stoves and ranges, refrigerators, kitchen sinks, exhaust hoods, water heaters, in addition to storage shelves, packing tables, food processing and packaging machines and dry storage areas; hydroponic growing systems in a closed environment structure comprised of lighting systems, water and nutrient distribution systems, environmental control systems and heating, cooling and ventilation systems
  • Class 019 — Non-metallic building materials: Prefabricated and portable modular non-metal buildings for use as office workspaces
  • Class 035 — Advertising and business services: Business management consulting not related to grocery stores and grocery store operations

Owner

Prior registrations

Prosecution history

  • 12 Sept 2023 — FINAL DECISION TRANSACTION PROCESSED BY IB
  • 23 Aug 2023 — FINAL DISPOSITION NOTICE SENT TO IB
  • 23 Aug 2023 — FINAL DISPOSITION PROCESSED
  • 23 Aug 2023 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
  • 23 May 2023 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
  • 23 May 2023 — REGISTERED-PRINCIPAL REGISTER
  • 07 Mar 2023 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 07 Mar 2023 — PUBLISHED FOR OPPOSITION
  • 06 Mar 2023 — NOTIFICATION PROCESSED BY IB
  • 15 Feb 2023 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
  • 15 Feb 2023 — NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
  • 15 Feb 2023 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 29 Jan 2023 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 26 Jan 2023 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 25 Jan 2023 — CORRESPONDENCE RECEIVED IN LAW OFFICE

View this trademark record on Marksy