CB
Dead / Abandoned — Abandoned — failure to respond (as of 25 Nov 2020)
What this means for you
This application is over — abandoned 17 Nov 2020. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.
Record
- Serial number
- 79281319
- Mark type
- Design + words
- Filed
- 06 Feb 2020
- Abandoned
- 17 Nov 2020
Goods and services
- Class 006 — Metal goods: Copper wire, not insulated; metal valves not being parts of machines; pipes and tubes of metal; junctions of metal for pipes; elbows of metal for pipes; doors of metal; metallic drain traps; metal, wash down spray nozzles for commercial and industrial use; water-pipe valves of metal; copper, unwrought or semi-wrought
- Class 011 — Environmental control apparatus: Pipes being parts of sanitary facilities; mixer taps for water pipes; taps being faucets; pipe accessory for hot- water heating device, namely, flashback arrestors and reverse flow check valves; pipes being parts of sanitary facilities, namely, three way pipe for hot-water heating device; pipes being parts of sanitary facilities, namely, four way pipe for hot- water heating device; plumbing fittings, namely, shower control valves; solar water heaters; sanitary apparatus and installations in the nature of steam rooms; regulating accessories for water or gas apparatus and pipes
Owner
Prosecution history
- 12 Dec 2021 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 25 Nov 2021 — FINAL DISPOSITION NOTICE SENT TO IB
- 25 Nov 2021 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 10 Sept 2021 — NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
- 25 Aug 2021 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 25 Aug 2021 — NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
- 25 Nov 2020 — ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
- 25 Nov 2020 — ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
- 29 May 2020 — REFUSAL PROCESSED BY IB
- 14 May 2020 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 14 May 2020 — REFUSAL PROCESSED BY MPU
- 30 Apr 2020 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 29 Apr 2020 — NON-FINAL ACTION WRITTEN
- 24 Apr 2020 — ASSIGNED TO EXAMINER
- 31 Mar 2020 — APPLICATION FILING RECEIPT MAILED