PICHLER STAHLBAU & FASSADEN
Live / Registered — Registered (as of 21 Dec 2021)
What this means for you
Registered since 21 Dec 2021. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79276337
- Registration number
- 6592272
- Mark type
- Slogan / phrase
- Filed
- 14 Oct 2019
- Published for opposition
- 05 Oct 2021
- Registered
- 21 Dec 2021
- Attorney of record
- John C. Holman
Goods and services
- Class 006 — Metal goods: Metal door frames; metal rods, namely, metal welding rods, metal brazing, metal reinforcing rod; metal architectural columns for construction; metal containers for storage or transport; roofing materials of metal, namely, metal roofing, metal roof flashing, metal roof trusses, metal roofing hips, metal roofing tiles, metal roofing panels, roofing covers of metal; transportable steel constructions; metal constructions, namely, metal piles, metal supports, metal braces, metal shores, fabricated metal components for building foundations, and metal cladding for construction and building; transportable metal constructions; metal windows; metal scaffolding; metal building materials, namely, metal floor panels, metal fascia, metal soffits, metal canopies, metal awnings, metal ceiling and floor boards, and metal reinforcing materials for building; metal refractory construction materials; metal doors; metal railings for bridges; metal wall cladding for construction; metal construction cladding; metal stairs; metal portable stairs; metal supports for construction; frames of metal for windows; metal partitions for building
- Class 019 — Non-metallic building materials: Non-metallic prefabricated buildings; transportable buildings of wood; transportable buildings, not of metal; concrete building elements, namely, concrete pipes, concrete panels, concrete vaults, concrete piles, concrete walls, concrete footings, concrete blocks, concrete beams, concrete bollards, concrete floors ; semi-worked construction wood; glass bricks; ceramic floor tiles and façade coverings; wall coverings non-metallic, namely, wall tiles not of metal, wall panels not of metal, non-metal wall cladding for building, wall boards; non-metallic reinforcement materials for construction, namely, reinforcing materials not of metal for building purposes; non-metallic modular animal stalls, non-metallic prefabricated stables; wooden window frames; wooden pipes for construction; insulating construction glass; insulating glass for construction
- Class 037 — Building construction and repair services: Building renovation; construction consultancy services relating to the construction of buildings and other structures; consultancy services relating to the maintenance, repair and renovation of buildings and engineering structures; building construction supervision services relating to shopping centers, industrial complexes, offices, residential buildings and other real estate structures; building construction supervision services concerning real estate projects; supervision of construction works for real estate projects; waterproofing services for basements and buildings
- Class 042 — Scientific and technological services: Consultancy in the field of technological design, namely, architectural design, building design, construction design; preparation of reports relating to technical architectural design studies for buildings; architectural services for the design of buildings; architectural services for the design of commercial buildings; architectural services for the design of industrial buildings; architectural services and engineering; civil engineering services; technical design studies in the field of construction, namely, architectural design, building design, construction design
Owner
Prosecution history
- 27 Jun 2022 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 04 Jun 2022 — FINAL DISPOSITION NOTICE SENT TO IB
- 03 Jun 2022 — FINAL DISPOSITION PROCESSED
- 21 Mar 2022 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 21 Dec 2021 — REGISTERED-PRINCIPAL REGISTER
- 10 Oct 2021 — NOTIFICATION PROCESSED BY IB
- 05 Oct 2021 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 05 Oct 2021 — PUBLISHED FOR OPPOSITION
- 15 Sept 2021 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 15 Sept 2021 — NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
- 15 Sept 2021 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 28 Aug 2021 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 29 Jul 2021 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 28 Jul 2021 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 28 Jul 2021 — TEAS REQUEST FOR RECONSIDERATION RECEIVED