HEURTEY PETROCHEM
Live / Registered — Registered (as of 18 Aug 2020)
What this means for you
Registered since 18 Aug 2020. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79267522
- Registration number
- 6126942
- Mark type
- Word mark
- Filed
- 06 Jun 2019
- Published for opposition
- 02 Jun 2020
- Registered
- 18 Aug 2020
- Attorney of record
- Jeffrey A. Smith
Goods and services
- Class 011 — Environmental control apparatus: Heating apparatus, namely, direct fired tube furnaces, direct fired furnaces, petrochemical and refining furnaces, heat recovery units; steam producing apparatus, namely, heat recovery boilers, industrial boilers; distillation apparatus and installations for distillation, namely, direct fired tube furnaces, direct-fired furnaces, atmospheric and vacuum distillation furnaces; refining towers for chemical distillation; equipment and installations for oil refining and in particular furnaces and distillation columns, namely, direct fired tube furnaces, direct fired furnaces, petrochemical and refining furnaces for heating, vaporizing and thermal cracking of oil products or oil fractions; apparatus and installations for the processing of oil residues, namely, direct fire heating installations for vaporizing oil residues and for rectifying the vaporized charge in a vacuum distillation column unit; equipment and installations for the production of chemicals from hydrocarbons, in particular furnaces and distillation columns for the production of hydrogen, ethylene and synthesis gas, namely, steam methane reformer for the production of hydrogen from natural gas, furnaces used for steam cracking for the production of ethylene from ethane, and for the cracking of dichlorethylene for the production of vinyl chloride monomer
- Class 037 — Building construction and repair services: Construction, rehabilitation, installation and repair services for industrial furnaces, permanent buildings, refineries, petrochemicals and hydrocarbon production plants; demolition of permanent buildings, refineries, petrochemicals and hydrocarbon production plants; installation and repair of heating apparatus, namely, directly fired tubular furnaces, directly fired furnaces, petrochemical and refining furnaces, heat recovery units, steam producing apparatus, namely, heat recovery boilers, industrial boilers, and distillation apparatus, namely, directly fired tubular furnaces, directly fired furnaces, atmospheric and vacuum distillation furnaces, for processing of gas and oil
- Class 042 — Scientific and technological services: Scientific and industrial research services in the fields of energy, environment, natural resources, oil and hydrocarbons; technical project studies, namely, scientific research and studies in the fields of energy, environment, natural resources, oil and hydrocarbons; engineering services, namely, appraisals in the fields of energy, environment, natural resources, oil and hydrocarbons; drawing up of plans for construction in the fields of energy, environment, natural resources, oil and hydrocarbons; construction consultancy in the fields of energy, environment, natural resources, oil and hydrocarbons; research and development of new processes in the fields of energy, environment, natural resources, oil and hydrocarbons; industrial design in the fields of energy, environment, natural resources, oil and hydrocarbons; quality control in the fields of energy, environment, natural resources, oil and hydrocarbons
Owner
Prior registrations
Prosecution history
- 18 Aug 2025 — COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
- 23 Jan 2025 — NEW REPRESENTATIVE AT IB RECEIVED
- 27 Dec 2024 — NEW REPRESENTATIVE AT IB RECEIVED
- 19 Mar 2021 — NEW REPRESENTATIVE AT IB RECEIVED
- 26 Dec 2020 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 08 Dec 2020 — FINAL DISPOSITION NOTICE SENT TO IB
- 07 Dec 2020 — FINAL DISPOSITION PROCESSED
- 18 Nov 2020 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 18 Aug 2020 — REGISTERED-PRINCIPAL REGISTER
- 05 Jun 2020 — NOTIFICATION PROCESSED BY IB
- 02 Jun 2020 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 02 Jun 2020 — PUBLISHED FOR OPPOSITION
- 20 May 2020 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 20 May 2020 — NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
- 13 May 2020 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED