ENERGYNEST

Live / Registered — Registered (as of 03 Dec 2019)

What this means for you

Registered since 03 Dec 2019. The owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
79258338
Registration number
5923582
Mark type
Design + words
Filed
04 Feb 2019
Published for opposition
18 Jun 2019
Registered
03 Dec 2019

Goods and services

  • Class 037 — Building construction and repair services: Advisory services in regard to installation of power plants; construction, installation, repair and maintenance of thermal and power plants; construction of power plants, especially for the production, storage and distribution of thermal energy; construction project management and maintenance services as well as supervisory services related thereto for power plants for the purpose of production, storage and distribution of thermal energy
  • Class 039 — Transportation and storage services: Contracting services, namely, consultancy and advisory services in regard to energy supply; storage of energy; distribution of energy; information and advisory services in regard to the distribution of energy; heat distribution
  • Class 042 — Scientific and technological services: Design and development of energy distribution networks; engineering services in the field of energy technology; engineering services relating to energy supply systems; design and development of regenerative energy generation systems; technological analysis relating to energy and power needs of others; provision of information concerning research and technical project studies relating to the use of natural energy; providing information concerning research and technical project studies relating to the use of natural energy; conducting research and technical project studies relating to the use of natural energy; technological consulting services in the field of alternative energy generation

Owner

Prosecution history

  • 26 Feb 2026 — NEW REPRESENTATIVE AT IB RECEIVED
  • 01 Apr 2023 — NEW REPRESENTATIVE AT IB RECEIVED
  • 14 Feb 2020 — NOTIFICATION PROCESSED BY IB
  • 27 Jan 2020 — FINAL DISPOSITION NOTICE SENT TO IB
  • 27 Jan 2020 — FINAL DISPOSITION PROCESSED
  • 02 Jan 2020 — GRANT OF PROTECTION CREATED, TO BE SENT TO IB
  • 03 Dec 2019 — REGISTERED-PRINCIPAL REGISTER
  • 28 Oct 2019 — EXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED
  • 04 Jul 2019 — EXTENSION OF TIME TO OPPOSE RECEIVED
  • 18 Jun 2019 — PUBLISHED FOR OPPOSITION
  • 29 May 2019 — NOTICE OF PUBLICATION
  • 14 May 2019 — APPLICATION FILING RECEIPT MAILED
  • 11 May 2019 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 10 May 2019 — ASSIGNED TO EXAMINER
  • 10 May 2019 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED

View this trademark record on Marksy