SUMI-MODULE
Live / Registered — Registered (as of 09 Jun 2020)
What this means for you
Registered since 09 Jun 2020. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79257925
- Registration number
- 6071691
- Mark type
- Stylized text
- Filed
- 30 Jan 2019
- Published for opposition
- 24 Mar 2020
- Registered
- 09 Jun 2020
- Attorney of record
- Boris Umansky
Goods and services
- Class 009 — Scientific and electric apparatus: Photovoltaic apparatus and installations for generating solar electricity, namely, photovoltaic units for the production of electrical power comprised of photovoltaic solar modules, inverters, electric junction boxes, power cables, and mounts for photovoltaic solar modules; photovoltaic installations for generating electricity, namely, solar modules for production of electricity, solar thermal and electric receivers, tracking mechanisms and concentrating optics, and control algorithms; solar panels for the production of electricity; solar cells; photovoltaic solar modules; photovoltaic cells; photovoltaic modules; automatic solar tracking sensors; power distribution or control machines and apparatus, namely, electrical power distribution units; testing and measuring equipment for use in testing the performance and efficiency of power plant equipment; electrical cells and batteries; electricity meters; magnetometers; computer software for measuring power generation performance of solar panels, downloadable or recorded; computers; computer software for design of photovoltaic power generation systems, downloadable or recorded; computer software for simulation of photovoltaic power generation systems, downloadable or recorded; computer software for monitoring and controlling photovoltaic power generation systems, downloadable or recorded; electric cables and wires; magnetic cores; resistance wires; electrodes
Owner
Prosecution history
- 09 Jun 2025 — COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
- 25 Oct 2020 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 01 Oct 2020 — FINAL DISPOSITION NOTICE SENT TO IB
- 01 Oct 2020 — FINAL DISPOSITION PROCESSED
- 09 Sept 2020 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 09 Jun 2020 — REGISTERED-PRINCIPAL REGISTER
- 24 Mar 2020 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 24 Mar 2020 — PUBLISHED FOR OPPOSITION
- 04 Mar 2020 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 12 Feb 2020 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 22 Jan 2020 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 21 Jan 2020 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 21 Jan 2020 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 16 Aug 2019 — REFUSAL PROCESSED BY IB
- 26 Jul 2019 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB