CREATEK

Live / Registered — Registered — Section 71 accepted (as of 09 Apr 2025)

What this means for you

Registered since 12 Nov 2019. The owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
79255074
Registration number
5905895
Mark type
Word mark
Filed
04 Sept 2018
Published for opposition
27 Aug 2019
Registered
12 Nov 2019
Attorney of record
Dana Stewart-Mekdara

Goods and services

  • Class 007 — Machines and machine tools: Injectors for engines; sealing joints being parts of engines; fan belts for motors and engines; cylinders for machines; fans for motors and engines; control mechanisms for machines, engines or motors, namely, hydraulic controls for machines, motors, and engines; automobile engine mufflers and exhaust pipes; silencers for motors and engines; oil filter; pistons for engines; radiators for motors and engines; fuel economizers for motors and engines, namely, fuel injectors; anti-pollution devices for motors and engines; hydraulic controls for machines, motors and engines; valves being parts of machines operated pneumatically and by air; couplings other than for land vehicles, namely, couplings for machines; crank shafts for machines; connecting rods for machines, motors and engines; speed governors for machines, engines and motors; springs being parts of machines; engine bearings for vehicles; adhesive bands for pulleys; brake pads other than for vehicles

Owner

Prosecution history

  • 09 Apr 2025 — NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED
  • 09 Apr 2025 — REGISTERED-SEC.71 ACCEPTED
  • 07 Apr 2025 — CASE ASSIGNED TO POST REGISTRATION PARALEGAL
  • 19 Nov 2024 — TEAS SECTION 71 RECEIVED
  • 12 Nov 2024 — COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
  • 27 Mar 2020 — FINAL DECISION TRANSACTION PROCESSED BY IB
  • 06 Mar 2020 — FINAL DISPOSITION NOTICE SENT TO IB
  • 06 Mar 2020 — FINAL DISPOSITION PROCESSED
  • 12 Feb 2020 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
  • 12 Nov 2019 — REGISTERED-PRINCIPAL REGISTER
  • 27 Aug 2019 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 27 Aug 2019 — PUBLISHED FOR OPPOSITION
  • 23 Aug 2019 — NOTIFICATION PROCESSED BY IB
  • 07 Aug 2019 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
  • 07 Aug 2019 — NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB

View this trademark record on Marksy