HYUNDAI HEAVY INDUSTRIES GREEN ENERGY

Dead / Abandoned — Abandoned — failure to respond (as of 20 Sept 2019)

What this means for you

This application is over — abandoned 23 Aug 2019. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.

Record

Serial number
79249606
Mark type
Stylized text
Filed
30 Oct 2018
Abandoned
23 Aug 2019

Goods and services

  • Class 007 — Machines and machine tools: Solar power generators; solar photovoltaic power generators using solar trackers; current generators; portable electric power generators
  • Class 009 — Scientific and electric apparatus: Solar batteries; solar cell panels; solar modules; photovoltaic solar modules; solar power modules for generation; supports for solar power generation modules; computer software for solar power generation system; simulators for solar cell module; solar collectors; apparatus for measuring solar cell efficiency and electric current; inverter used in solar power generation; apparatus for inspecting solar power generating facilities; automatic solar tracking sensors; electricity connector used in solar power generation; current converters concerning solar energy; electrical controlling devices; inverters; high voltage reactors; electric reactors; transformers; electric power distribution machines; electric power converters; current rectifiers; electricity transporting system apparatus; energy storage apparatus comprised of batteries; solar energy storage device; computer software for energy storage system; apparatus and instruments for accumulating and storing electricity; battery packs; electric batteries; electric wires; electrical sockets; data processing apparatus; downloadable electronic publications; solar cell wafer
  • Class 037 — Building construction and repair services: Installation, maintenance and repair of photovoltaic cells and modules; installation, maintenance and repair of photovoltaic equipment for electricity generation; installation services for solar powered devices for others; new regeneration energy factory construction; maintenance, servicing and repair of apparatus and installations for generating power; maintenance of electric power distribution apparatus, electrical controllers and transformers (electricity); installation, maintenance and repair of power device
  • Class 040 — Treatment of materials: Electricity generating of photovoltaic power generation; rental of photovoltaic power generation installations; technical consultancy in the field of production of solar energy; electricity generating; processing and transforming of energy; production of energy; generation of power; rental of energy generating equipment; consultancy services relating to the generation of electrical energy
  • Class 042 — Scientific and technological services: Research and development relating to renewable energy production; research and development relating to electric power production, switch, power distribution, power control for renewable energy system; design and development of photovoltaic systems; technological consulting services in the field of alternative energy generation; research in the field of energy; research and development relating to electricity control apparatus and instruments; research and development relating to electric power storage system; development relating to computer software for solar power generation; development relating to computer software for solar power generators

Owner

Prosecution history

  • 27 Feb 2021 — NEW REPRESENTATIVE AT IB RECEIVED
  • 10 Oct 2020 — FINAL DECISION TRANSACTION PROCESSED BY IB
  • 21 Sept 2020 — FINAL DISPOSITION NOTICE SENT TO IB
  • 20 Sept 2020 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
  • 26 Jun 2020 — NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
  • 10 Jun 2020 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
  • 10 Jun 2020 — NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
  • 20 Sept 2019 — ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
  • 20 Sept 2019 — ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
  • 07 Jun 2019 — NEW REPRESENTATIVE AT IB RECEIVED
  • 16 Mar 2019 — REFUSAL PROCESSED BY IB
  • 22 Feb 2019 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
  • 22 Feb 2019 — REFUSAL PROCESSED BY MPU
  • 13 Feb 2019 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
  • 12 Feb 2019 — NON-FINAL ACTION WRITTEN

View this trademark record on Marksy