RSP

Live / Registered — Registered — international registration renewed (as of 16 Jan 2026)

What this means for you

Registered since 03 Sept 2019. The owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
79240836
Registration number
5847604
Mark type
Design + words
Filed
22 Feb 2018
Published for opposition
18 Jun 2019
Registered
03 Sept 2019
Attorney of record
Klaus P. Stoffel

Goods and services

  • Class 007 — Machines and machine tools: Construction machines, namely, air suction excavating machines; excavators, namely, earth moving machines; machines with fan-based special suction air suction technology; machines for the remediation of tree roots, namely, air suction excavating machines for removing soil around tree roots; machines for the rehabilitation of pipelines, namely, air suction excavating machines for the use on pipelines; structural parts and fittings for air suction excavating machines; air suction excavating machines; air suction excavating machines with installed gas-detection warning and grounding systems; air suction excavating machines for special civil engineering; air suction excavating machines for suctioning soil organic matter, raw material especially clay, sand, gravel, rocks and stones, liquid material especially water, sludge and mud, and waste material especially excavated material, demolition material, building rubble and plant waste

Owner

Prosecution history

  • 16 Jan 2026 — NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED
  • 16 Jan 2026 — REGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK.
  • 12 Jan 2026 — CASE ASSIGNED TO POST REGISTRATION PARALEGAL
  • 03 Sept 2025 — TEAS SECTION 71 & 15 RECEIVED
  • 28 Aug 2025 — CHANGE OF NAME/ADDRESS REC'D FROM IB
  • 03 Sept 2024 — COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
  • 17 Jan 2020 — FINAL DECISION TRANSACTION PROCESSED BY IB
  • 28 Dec 2019 — FINAL DISPOSITION NOTICE SENT TO IB
  • 28 Dec 2019 — FINAL DISPOSITION PROCESSED
  • 03 Dec 2019 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
  • 03 Sept 2019 — REGISTERED-PRINCIPAL REGISTER
  • 18 Jun 2019 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 18 Jun 2019 — PUBLISHED FOR OPPOSITION
  • 14 Jun 2019 — NOTIFICATION PROCESSED BY IB
  • 29 May 2019 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB

View this trademark record on Marksy