HEXAPLI
Live / Registered — Registered (as of 01 Oct 2019)
What this means for you
Registered since 01 Oct 2019. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79240514
- Registration number
- 5870427
- Mark type
- Stylized text
- Filed
- 13 Apr 2018
- Published for opposition
- 16 Jul 2019
- Registered
- 01 Oct 2019
- Attorney of record
- JOSEPH SOFER
Goods and services
- Class 019 — Non-metallic building materials: Non-metallic building materials, namely, wood cladding; semi-worked composite wood; semi-worked wood for building; veneer wood; sawn timber; manufactured timber; wood, semi-worked; furrings of wood; framework for building, not of metal; non-metal wainscotting; non-metal shingles; non-metallic cladding panels for building; non-metallic cladding materials for building; non-metallic cladding panels for roofs; non-metallic cladding for facades; wood posts; wood rafters; floor boards of wood; wooden decking boards for building; parquet floor boards; timber boarding, all the aforesaid goods being for interior and exterior cladding of facades; ceilings, not of metal; floors, not of metal; glue-laminated wood; non-metallic transportable buildings; canopies in the nature of shelter structures of non-metallic materials; non-metallic pergolas; arbours not of metal; swimming pools, not of metal; cabanas, not of metal; roof coverings, not of metal, for building; floorboards; fences, not of metal; path edgings made of non-metallic materials; turnstiles, not of metal; paving slabs, not of metal; non-metal railings for balconies; non-metallic balcony enclosures; garden sheds of wood; timber building boards; non-metallic sidewalls in the nature of wall panels; roof coverings, not of metal; latticework, not of metal; reinforcing materials, not of metal, for building; non-metallic shelter structures; non-metallic curtain walls; non-metallic damp course materials, namely, waterproofing membranes for roofing, floors and walls
- Class 037 — Building construction and repair services: Installation of cladding; installing fencing; placement of boards, namely, installation of floorboards and installation of wallboard; installation of gates; installation of screen walls; installation of screens; installation of windscreens; installation of pergolas; installation of garden furniture; installation of structural panels made of wood; maintenance of cladding; maintenance of fences; panel maintenance in the nature of the maintenance of wood panels; maintenance of gates; maintenance of screen walls; maintenance of screens; maintenance of windscreens; maintenance of pergolas; maintenance of garden furniture; providing construction information; building consultancy, namely, consultation regarding construction; building construction supervision; installation of building insulation; installation of insulation to existing buildings; installation of insulation into internal and external walls, ceilings and roofs; installation of fireproofing materials during construction
- Class 040 — Treatment of materials: Dry-rot treatment of timber; preservative treatment of wood, other than painting; treatment of timber with preservatives; sawing of timber; planing of materials; woodworking; planing of timber; providing information relating to woodworking; flame proofing of non-metallic building materials made of wood; fireproofing of existing structures; fireproofing of existing buildings; treatment of materials, namely, fireproofing wood
Owner
- PIVETEAU BOIS, F-85140 ESSARTS EN BOCAGE, FR
- PIVETEAU BOIS, F-85140 ESSARTS EN BOCAGE, FR
- PIVETEAU BOIS, F-85140 ESSARTS EN BOCAGE, FR
Prosecution history
- 14 Feb 2020 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 24 Jan 2020 — FINAL DISPOSITION NOTICE SENT TO IB
- 24 Jan 2020 — FINAL DISPOSITION PROCESSED
- 01 Jan 2020 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 01 Oct 2019 — REGISTERED-PRINCIPAL REGISTER
- 16 Jul 2019 — PUBLISHED FOR OPPOSITION
- 26 Jun 2019 — NOTICE OF PUBLICATION
- 10 Jun 2019 — EXAMINERS AMENDMENT MAILED
- 07 Jun 2019 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 07 Jun 2019 — EXAMINER'S AMENDMENT ENTERED
- 07 Jun 2019 — EXAMINERS AMENDMENT -WRITTEN
- 30 May 2019 — NON-FINAL ACTION MAILED
- 29 May 2019 — NON-FINAL ACTION WRITTEN
- 25 Apr 2019 — CORRECTION FROM IB ENTERED - ATTORNEY REVIEW REQUIRED
- 09 Apr 2019 — TEAS/EMAIL CORRESPONDENCE ENTERED