BATHSYSTEM
Live / Registered — Registered — partial invalidation of extension of protection (as of 14 Aug 2025)
What this means for you
Registered since 23 Jul 2019. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79239848
- Registration number
- 5809231
- Mark type
- Design + words
- Filed
- 17 Jul 2018
- Published for opposition
- 07 May 2019
- Registered
- 23 Jul 2019
- Attorney of record
- Ben Natter
Goods and services
- Class 019 — Non-metallic building materials: Non-metallic building materials, namely, prefabricated bathroom and kitchen modules comprised of non-metal wall panels, non-metal floors, non-metal floor tiles, non-metal ceiling panels, non-metal claddings for building, non-metal framework for building; non-metallic rigid pipes for building, non-metallic transportable buildings, for production of precast bathrooms and kitchens
- Class 037 — Building construction and repair services: Construction, repair, installation, maintenance and assembly of precast bathrooms and kitchens made of concrete and steel
- Class 042 — Scientific and technological services: [Scientific and technological services, namely, research and design in the field of engineering, industrial design, planning and design of bathrooms and kitchens; industrial analysis and research services in the field of engineering, industrial design, planning and design of bathrooms and kitchens; design and development of computer hardware and software, for production of precast bathrooms and kitchens made of concrete and steel]
Owner
- BATHSYSTEM S.P.A., IT
- BATHSYSTEM S.P.A., IT
- BATHSYSTEM S.P.A., IT
Prosecution history
- 14 Aug 2025 — NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED
- 14 Aug 2025 — REGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK.
- 12 Aug 2025 — CASE ASSIGNED TO POST REGISTRATION PARALEGAL
- 20 May 2025 — TEAS SECTION 71 & 15 RECEIVED
- 23 Jul 2024 — COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
- 06 Dec 2019 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 18 Nov 2019 — FINAL DISPOSITION NOTICE SENT TO IB
- 18 Nov 2019 — FINAL DISPOSITION PROCESSED
- 23 Oct 2019 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 23 Jul 2019 — REGISTERED-PRINCIPAL REGISTER
- 04 Jul 2019 — INTERNATIONAL REGISTRATION RENEWED
- 07 May 2019 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 07 May 2019 — PUBLISHED FOR OPPOSITION
- 03 May 2019 — NOTIFICATION PROCESSED BY IB
- 17 Apr 2019 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB