CKS KESHUN
Dead / Abandoned — Abandoned — failure to respond (as of 08 Jan 2019)
What this means for you
This application is over — abandoned 03 Dec 2018. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.
Record
- Serial number
- 79232279
- Mark type
- Word mark
- Filed
- 04 Sept 2017
- Abandoned
- 03 Dec 2018
Goods and services
- Class 002 — Paints: Ink for leather; anticorrosive paints; raw natural resins; paints; colorants; powdered paints; colorants for food and beverages; inks for skin dressing; waterproof paints; coating preparations having water repellent properties [paint]; anti-corrosive paints
- Class 019 — Non-metallic building materials: Shaped timber; bricks; non-metallic transportable buildings; cement; concrete building materials, namely, blocks, bricks, posts, slabs, and panels; multilayer panels of plastic for use in building; raw and coated chip boards for the building industry, furniture and interior decorating; refractory cement; waterproofing membranes for roofing, floors and walls (terms too vague in the opinion of the International Bureau - Rule 13 (2) (b) of the Common Regulations); building glass; polymeric bitumen emulsions for road surfaces; mortar for building; gypsum [building material]
Owner
Prosecution history
- 08 Jul 2022 — CHANGE OF NAME/ADDRESS REC'D FROM IB
- 11 Jun 2022 — NEW REPRESENTATIVE AT IB RECEIVED
- 24 Jan 2020 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 08 Jan 2020 — FINAL DISPOSITION NOTICE SENT TO IB
- 08 Jan 2020 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 08 Nov 2019 — NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
- 23 Oct 2019 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 23 Oct 2019 — NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
- 08 Jan 2019 — ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
- 08 Jan 2019 — ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
- 15 Jun 2018 — REFUSAL PROCESSED BY IB
- 31 May 2018 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 31 May 2018 — REFUSAL PROCESSED BY MPU
- 26 May 2018 — APPLICATION FILING RECEIPT MAILED
- 24 May 2018 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW