METABOARDS
Live / Registered — Cancelled — Section 71 (as of 26 Sept 2025)
What this means for you
Registered since 12 Mar 2019. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79231618
- Registration number
- 5694063
- Mark type
- Stylized text
- Filed
- 30 Jan 2018
- Published for opposition
- 25 Dec 2018
- Registered
- 12 Mar 2019
Goods and services
- Class 009 — Scientific and electric apparatus: Apparatus and instruments for conducting, converting, switching, transforming, accumulating, regulating or controlling electricity, namely, electric accumulators, electrical controllers, and electrical relays and transformers; apparatus and instruments for storage, transmission and reproduction of data; data processing equipment, namely, data processors; apparatus and instruments for generating, transferring and injecting power and electricity, namely, electricity conduits, electricity limiters, power strips, power switches, and power controllers; digital communication apparatus and instruments, namely, electronic and optical communications instruments and components in the nature of digital transmitters; wearable digital communication apparatus and instruments, namely, wearable activity trackers and wearable computers in the nature of smartwatches; distance measuring apparatus; measuring sensors, namely, sensors for measuring concentrations of chemicals in water; electronic sensors for measuring solar radiation; apparatus and instruments for measuring and monitoring temperature, pressure, light intensity, strain and other measurands, namely, temperature sensors, light sensors, and pressure sensors; computer monitors; wearable video display monitors; electronic displays, namely, digital signage; battery chargers; wireless chargers in the nature of power transfer tiles; wireless chargers in the nature of power injection tiles; electrical circuit boards; circuit boards; arrays of circuit boards; LRC circuits, namely, electronic integrated circuits; integrated circuits; wireless power receivers; resonators; passive resonators; control resonators; electrical circuit closers, openers, switches, and circuit boards incorporated into products; circuit boards imbedded in polymers; circuit boards imbedded in ceramics; circuit boards imbedded in glass; circuit boards imbedded in wood; electrical systems comprised of conductive fibers, battery chargers, electric conductivity monitor, and electronic display interfaces that enable electrical conduction, electrical charging, electronic data transmission, environmental monitoring and electronic display; bullet-proof vests; bullet-proof vests incorporating apparatus, instruments and devices that enable electrical conduction, electrical charging, electronic data transmission, environmental monitoring and electronic display properties; replacement parts and fittings for all the aforementioned goods
- Class 042 — Scientific and technological services: Product research and development services; engineering research and development services; scientific research and development services; engineering design services; research, design and development of electrical apparatus and instruments; research, design and development of apparatus and instruments for generating, transferring and injecting power electricity; research, design and development of measuring apparatus and instruments; research, design and development of data processing equipment; research, design and development of electronic systems that enable electrical conduction, electrical charging, electronic data transmission, environmental monitoring and electronic display; consultancy, advisory and information services relating to the research, development, and design of the aforementioned services
Owner
- Metaboards Limited, OXFORD, GB
- Metaboards Limited, OXFORD, GB
- Metaboards Limited, OXFORD, GB
Prosecution history
- 26 Sept 2025 — CANCELLED SECTION 71
- 22 Nov 2024 — NEW REPRESENTATIVE AT IB RECEIVED
- 26 Jul 2019 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 09 Jul 2019 — FINAL DISPOSITION NOTICE SENT TO IB
- 09 Jul 2019 — FINAL DISPOSITION PROCESSED
- 12 Jun 2019 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 12 Mar 2019 — REGISTERED-PRINCIPAL REGISTER
- 01 Feb 2019 — NEW REPRESENTATIVE AT IB RECEIVED
- 25 Dec 2018 — PUBLISHED FOR OPPOSITION
- 05 Dec 2018 — NOTICE OF PUBLICATION
- 16 Nov 2018 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 15 Nov 2018 — EXAMINERS AMENDMENT MAILED
- 15 Nov 2018 — EXAMINER'S AMENDMENT ENTERED
- 15 Nov 2018 — EXAMINERS AMENDMENT -WRITTEN
- 24 Oct 2018 — TEAS/EMAIL CORRESPONDENCE ENTERED