ESSER TWIN PIPES

Live / Registered — Registered — partial invalidation of extension of protection (as of 22 Apr 2025)

What this means for you

Registered since 30 Apr 2019. The owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
79231343
Registration number
5736113
Mark type
Design + words
Filed
30 Jan 2018
Published for opposition
12 Feb 2019
Registered
30 Apr 2019
Attorney of record
Donna J. Bunton

Goods and services

  • Class 006 — Metal goods: Pipes and pipelines in the nature of pipes, tubes and pipe connectors, pipe bends in the nature of pipe couplings and joints, junctions for pipes, pipe flanges, reducers in the nature of pipe couplings, all the aforesaid goods of metal
  • Class 007 — Machines and machine tools: [ Construction machines, namely, concrete construction machines, road building machines, conveyors; thick matter pumps in the nature of sludge pumps, silt pumps and electric pumps and concrete placing machines, namely, concrete spreading poles and parts therefor, namely, structural parts of concrete spreading poles, replacement parts for sludge pumps, structural parts for sludge pumps and belts for machines ]
  • Class 019 — Non-metallic building materials: [ Non-metal rigid pipes for building purposes ]

Owner

Prosecution history

  • 22 Dec 2025 — PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED
  • 22 Apr 2025 — NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED
  • 22 Apr 2025 — REGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK.
  • 21 Apr 2025 — CASE ASSIGNED TO POST REGISTRATION PARALEGAL
  • 09 Dec 2024 — TEAS SECTION 71 & 15 RECEIVED
  • 11 Oct 2024 — CHANGE OF OWNER RECEIVED FROM IB
  • 30 Apr 2024 — COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
  • 13 Sept 2019 — FINAL DECISION TRANSACTION PROCESSED BY IB
  • 22 Aug 2019 — FINAL DISPOSITION NOTICE SENT TO IB
  • 22 Aug 2019 — FINAL DISPOSITION PROCESSED
  • 30 Jul 2019 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
  • 30 Apr 2019 — REGISTERED-PRINCIPAL REGISTER
  • 12 Feb 2019 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 12 Feb 2019 — PUBLISHED FOR OPPOSITION
  • 08 Feb 2019 — NOTIFICATION PROCESSED BY IB

View this trademark record on Marksy