IGLOOTUBE
Live / Registered — Registered (as of 03 Dec 2019)
What this means for you
Registered since 03 Dec 2019. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79228345
- Registration number
- 5923212
- Mark type
- Stylized text
- Filed
- 28 Dec 2017
- Published for opposition
- 17 Sept 2019
- Registered
- 03 Dec 2019
- Attorney of record
- Stephen P. Burr
Goods and services
- Class 019 — Non-metallic building materials: Transportable buildings, not of metal, based on a kit and using prefabricated components, in particular as holiday apartments, garden sheds, garages, mobile homes or sauna buildings; prefabricated houses (kits), not of metal; transportable pavilions made of non-metallic materials; building materials, not of metal, namely, semi-worked woods; the aforesaid goods in particular made of wood
- Class 037 — Building construction and repair services: Construction supervision; construction of buildings, in particular prefabricated buildings and buildings, being holiday apartments, garden sheds, garages, mobile homes or sauna buildings; construction of pavilions; construction of terraces; installation of prefabricated building components; construction consultancy
- Class 042 — Scientific and technological services: Consultancy services relating to construction drafting; conducting technical project studies related to construction; engineering services in the field of construction as far as technical building equipment and appliances
Owner
- Vanco Tancev, DD
- Vanco Tancev, DD
- Vanco Tancev, DD
- Eugen Gutfreund, DD
- Eugen Gutfreund, DD
- Eugen Gutfreund, DD
- Krsto Tancev, DD
- Krsto Tancev, DD
- Krsto Tancev, DD
Prosecution history
- 03 Dec 2024 — COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
- 17 Jul 2020 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 18 Mar 2020 — GENERIC MADRID TRANSACTION SENT TO IB
- 18 Mar 2020 — GENERIC MADRID TRANSACTION CREATED
- 03 Mar 2020 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 03 Dec 2019 — REGISTERED-PRINCIPAL REGISTER
- 17 Sept 2019 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 17 Sept 2019 — PUBLISHED FOR OPPOSITION
- 13 Sept 2019 — NOTIFICATION PROCESSED BY IB
- 30 Aug 2019 — NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
- 28 Aug 2019 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 28 Aug 2019 — NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
- 28 Aug 2019 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 14 Aug 2019 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 14 Aug 2019 — NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB