SOLTEC
Dead / Abandoned — Abandoned — failure to respond (as of 12 Oct 2018)
What this means for you
This application is over — abandoned 25 Sept 2018. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.
Record
- Serial number
- 79226577
- Mark type
- Design + words
- Filed
- 26 Dec 2017
- Abandoned
- 25 Sept 2018
Goods and services
- Class 007 — Machines and machine tools: Machinery for agriculture, earth moving, construction, extraction of oil and gas, and mining; machines and machine tools for the treatment of materials and manufacturing; engines, engine equipment and generic machine parts; generators of electricity
- Class 009 — Scientific and electric apparatus: Apparatus, instruments and cables for conducting electricity; signaling, protection, safety and life-saving devices; electric devices for processing; information technology equipment; instruments for measuring, detecting and monitoring, indicators and controllers; excluding audiovisual apparatus, interactive terminals, LCD (liquid crystal displays)
- Class 037 — Building construction and repair services: Machinery installation services; installation and maintenance of thermal solar installations; installation and maintenance of photovoltaic installations; maintenance and repair of installations in buildings
Owner
Prosecution history
- 17 Jul 2021 — NEW REPRESENTATIVE AT IB RECEIVED
- 01 Nov 2019 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 14 Oct 2019 — FINAL DISPOSITION NOTICE SENT TO IB
- 12 Oct 2019 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 26 Jul 2019 — NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
- 10 Jul 2019 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 10 Jul 2019 — NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
- 12 Oct 2018 — ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
- 12 Oct 2018 — ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
- 06 Apr 2018 — REFUSAL PROCESSED BY IB
- 22 Mar 2018 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 22 Mar 2018 — REFUSAL PROCESSED BY MPU
- 17 Mar 2018 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 16 Mar 2018 — NON-FINAL ACTION WRITTEN
- 28 Feb 2018 — ASSIGNED TO EXAMINER