BARICON
Live / Registered — Registered — partial invalidation of extension of protection (as of 30 Jul 2025)
What this means for you
Registered since 30 Oct 2018. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79224395
- Registration number
- 5592558
- Mark type
- Design + words
- Filed
- 04 Aug 2017
- Published for opposition
- 14 Aug 2018
- Registered
- 30 Oct 2018
- Attorney of record
- ROBERT S. BRODER
Goods and services
- Class 007 — Machines and machine tools: Tensioners, tensioners for pipes, cables, umbilicals, flexible pipes, and risers all being machines parts of pipe laying and cable laying systems; cable laying tensioners being machines for placing cables on the seabed; machines for placing cables on the seabed; [ machines for installing offshore pipelines; machines for installing subsea pipelines; pipe laying machines; ] systems for placing cables on the seabed, namely, cable laying machines systems containing tensioners, tensioners for pipes, cables, umbilicals, flexible pipes, and risers
- Class 012 — Vehicles: [ cable transport apparatus and installations, namely, self driven or tugged barges and ships for the transport of pipes, cables and subsea umbilical risers and flexibles ]
- Class 042 — Scientific and technological services: [ Design and development in the field of offshore engineering; design of tensioners ]
Owner
- INNOVO Engineering and Construction LTD, Aberdeen, GB
- INNOVO Engineering and Construction LTD, Aberdeen AB10 1UQ, GB
- INNOVO Engineering and Construction LTD, Aberdeen AB10 1UQ, GB
Prosecution history
- 30 Mar 2026 — PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED
- 30 Jul 2025 — NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED
- 30 Jul 2025 — REGISTERED - PARTIAL SEC 71 ACCEPTED
- 28 Jul 2025 — CASE ASSIGNED TO POST REGISTRATION PARALEGAL
- 29 Apr 2025 — TEAS SECTION 71 RECEIVED
- 30 Oct 2023 — COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
- 03 Jul 2021 — CHANGE OF NAME/ADDRESS REC'D FROM IB
- 01 Mar 2019 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 09 Feb 2019 — FINAL DISPOSITION NOTICE SENT TO IB
- 09 Feb 2019 — FINAL DISPOSITION PROCESSED
- 30 Jan 2019 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 30 Oct 2018 — REGISTERED-PRINCIPAL REGISTER
- 14 Aug 2018 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 14 Aug 2018 — PUBLISHED FOR OPPOSITION
- 11 Aug 2018 — NOTIFICATION PROCESSED BY IB