MORE.MORETTIMORE

Dead / Abandoned — Abandoned — failure to respond (as of 06 Aug 2018)

What this means for you

This application is over — abandoned 10 Jul 2018. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.

Record

Serial number
79222528
Mark type
Word mark
Filed
27 Apr 2017
Abandoned
10 Jul 2018

Goods and services

  • Class 019 — Non-metallic building materials: Prefabricated building components; reinforced concrete prefabricated components for buildings; modular homes, not of metal; prefabricated buildings; prefabricated non-metal buildings; transportable buildings; monocoque buildings; sectional buildings; casings for use in building or construction; minerals for use in construction; building boards of plastics materials; cement for building purposes; bitumen building materials; building components of wood; concrete; concrete building elements; concrete slabs; concrete piles; concrete beams; reinforced concrete; ceramic tiles for flooring of building; doors made of wood for buildings; doors made of plastic for buildings; doors made of glass for buildings; joinery products of timber for use in buildings; profiles for building construction; bituminous coverings for use in building construction; modular units for constructing prefabricated buildings; building glass
  • Class 036 — Insurance and financial services: Real estate services; real estate services and property management services; apartment house management leasing; rental of buildings; real estate agency services; agencies or brokerage for renting of buildings; insurance of buildings; financial services relating to real estate property and buildings; valuation of buildings; real estate consultancy
  • Class 037 — Building construction and repair services: Construction services; construction of buildings and other structures; assembly of prefabricated houses; construction works for prefabricated houses; civil engineering construction; application of coatings to buildings; construction of parts of buildings; construction of steel structures for buildings; erection of prefabricated buildings and structures; building restoration; providing information relating to the construction, repair and maintenance of buildings; on site project management relating to the construction of buildings; installation of fixtures and fittings for buildings; installation of building insulation; building maintenance and repair; rental of machines, tools and apparatus for building construction; cleaning of buildings; renovation and restoration of buildings; information services relating to the construction of buildings; building construction supervision; building, construction and demolition; construction of civil engineering structures by laying concrete
  • Class 042 — Scientific and technological services: Design services; design of buildings; architectural and engineering services; civil engineering consultancy; analysis of the structural behaviour of buildings; technological research for the building construction industry; professional consultancy relating to energy efficiency in buildings; advisory services relating to building design; interior architectural services; quality control of building materials; design of engineered building systems; conducting technical project studies for construction projects

Owner

Prosecution history

  • 29 Nov 2025 — NEW REPRESENTATIVE AT IB RECEIVED
  • 05 Aug 2022 — CHANGE OF OWNER RECEIVED FROM IB
  • 23 Aug 2019 — FINAL DECISION TRANSACTION PROCESSED BY IB
  • 06 Aug 2019 — FINAL DISPOSITION NOTICE SENT TO IB
  • 06 Aug 2019 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
  • 24 May 2019 — NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
  • 08 May 2019 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
  • 08 May 2019 — NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
  • 26 Oct 2018 — UNDELIVERABLE MAIL - NO ACTION TAKEN
  • 06 Aug 2018 — ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
  • 06 Aug 2018 — ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
  • 27 Jan 2018 — REFUSAL PROCESSED BY IB
  • 08 Jan 2018 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
  • 08 Jan 2018 — REFUSAL PROCESSED BY MPU
  • 17 Dec 2017 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW

View this trademark record on Marksy