F FLENCO
Live / Registered — Registered (as of 04 Dec 2018)
What this means for you
Registered since 04 Dec 2018. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79222191
- Registration number
- 5619580
- Mark type
- Word mark
- Filed
- 16 Aug 2017
- Published for opposition
- 18 Sept 2018
- Registered
- 04 Dec 2018
- Attorney of record
- Amy C. Ziegler
Goods and services
- Class 007 — Machines and machine tools: Machines and machine tools, namely, gas and steam turbines, compressors, pumps and power generators; motors and engines other than for land vehicles, namely, motors and engines for gas and steam turbines, compressors, pumps and power generators; couplings and transmission belts other than for land vehicles; automatic lubricating installations and systems composed of lube oil consoles to lubricate compressors and turbines using motors couplings, pumps, filters, valves and coolers; [ cooling and injection skids to be used for sealing, ] hydraulic and control oil skids to be integrated with turbines, compressors, generators in the power generation, petrochemical and oil and gas industry; such skids are composed of valves, pipes, motor-pumps, filters, heaters and refrigerants as a whole assembly; lubricating pumps
Owner
- FLENCO FLUID SYSTEM S.r.l., AVIGLIANA (TORINO), IT
- FLENCO FLUID SYSTEM S.r.l., IT
- FLENCO FLUID SYSTEM S.r.l., IT
Prosecution history
- 09 Mar 2026 — PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED
- 30 Dec 2025 — TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED
- 28 Nov 2025 — NEW REPRESENTATIVE AT IB RECEIVED
- 09 Jul 2025 — OFFICE ACTION ISSUED POU2
- 13 May 2025 — CASE ASSIGNED TO POST REGISTRATION PARALEGAL
- 05 May 2025 — TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED
- 03 Nov 2024 — OFFICE ACTION ISSUED POU1
- 28 Oct 2024 — CASE ASSIGNED TO POST REGISTRATION PARALEGAL
- 02 Oct 2024 — TEAS SECTION 71 & 15 RECEIVED
- 04 Dec 2023 — COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
- 09 Jun 2022 — INTERNATIONAL REGISTRATION RENEWED
- 05 Apr 2019 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 15 Mar 2019 — FINAL DISPOSITION NOTICE SENT TO IB
- 15 Mar 2019 — FINAL DISPOSITION PROCESSED
- 04 Mar 2019 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB