GARDO
Live / Registered — Registered — partial invalidation of extension of protection (as of 11 Jun 2025)
What this means for you
Registered since 29 Jan 2019. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79221177
- Registration number
- 5663333
- Mark type
- Stylized text
- Filed
- 21 Jun 2017
- Published for opposition
- 13 Nov 2018
- Registered
- 29 Jan 2019
- Attorney of record
- Joyce M. Ferraro
Goods and services
- Class 001 — Chemicals: Chemical products used in industry, namely, chemicals for the treatment both pre- and after treatment of metallic and plastic surfaces for the creation of a suitable base for painting and coating by derusting and phosphating, for the improvement of corrosion resistance, for facilitating cold forming, for improving sliding properties, for enhancing electrical resistance, and for paint removal or paint detackification
- Class 002 — Paints: Preservatives against rust and pickling products in the nature of a coating for metallic surfaces (( [ ; industrial oils and lubricants, namely, anti-rust rolling oils and anti-corrosion oils and lubricants for metals ] ))
- Class 003 — Cosmetics and cleaning preparations: (( [ Chemical cleaners for metallic and plastic surfaces in the nature of a chemical pretreatment and a degreasing cleaning preparation used before painting ] ))
- Class 004 — Lubricants and fuels: (( [ Industrial oils and lubricants, namely, rolling oils and oils and lubricants used in the de-formation of metals ] ))
Owner
- Chemetall GmbH, Frankfurt am Main, DE
- Chemetall GmbH, 60487 Frankfurt am Main, DE
- Chemetall GmbH, 60487 Frankfurt am Main, DE
Prosecution history
- 15 Mar 2026 — PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED
- 19 Feb 2026 — INTERNATIONAL REGISTRATION RENEWED
- 11 Feb 2026 — PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED
- 23 Jan 2026 — PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED
- 15 Jul 2025 — SEC. 15 ACKNOWLEDGEMENT - E-MAILED
- 15 Jul 2025 — REGISTERED - SEC. 15 ACKNOWLEDGED
- 11 Jun 2025 — NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED
- 11 Jun 2025 — REGISTERED - PARTIAL SEC 71 ACCEPTED
- 11 Jun 2025 — NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED
- 11 Jun 2025 — REGISTERED - PARTIAL SEC 71 ACCEPTED
- 11 Jun 2025 — NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED
- 11 Jun 2025 — REGISTERED - PARTIAL SEC 71 ACCEPTED
- 19 May 2025 — CASE ASSIGNED TO POST REGISTRATION PARALEGAL
- 30 Jan 2025 — TEAS SECTION 15 RECEIVED
- 28 Jan 2025 — TEAS SECTION 71 RECEIVED