SUPRIMAIR
Live / Registered — Cancelled — Section 71 (as of 02 Jan 2026)
What this means for you
Registered since 18 Jun 2019. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79220123
- Registration number
- 5777933
- Mark type
- Stylized text
- Filed
- 13 Sept 2017
- Published for opposition
- 02 Apr 2019
- Registered
- 18 Jun 2019
- Attorney of record
- Jess M. Collen
Goods and services
- Class 006 — Metal goods: Frames of metal for building; Transportable buildings of metal; Porches (buildings) of metal; Frames of steel for building; metal facade panels; Roofing panels of metal; Metal frames for greenhouses; Metal components of greenhouses, namely, slats, shutterboxes, side frames, end caps, crank handles, pull straps, side tracks, ball bearings and installation hardware, namely, rollers, rails, cables, carriers, pins, locks, clips, brackets and screws; Metal structures for mounting solar panels; Greenhouses of metal
- Class 011 — Environmental control apparatus: Water disinfection apparatus, water purification installations and apparatus for use in greenhouses
- Class 037 — Building construction and repair services: Building construction; Construction, repair, maintenance and installation of greenhouses; Building construction supervision
Owner
- Belua Beheer B.V., NL-2685 DG Poeldijk, NL
- Belua Beheer B.V., NL-2685 DG Poeldijk, NL
- Belua Beheer B.V., NL-2685 DG Poeldijk, NL
Prosecution history
- 02 Jan 2026 — CANCELLED SECTION 71
- 18 Jun 2024 — COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
- 11 Oct 2019 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 25 Sept 2019 — FINAL DISPOSITION NOTICE SENT TO IB
- 25 Sept 2019 — FINAL DISPOSITION PROCESSED
- 18 Sept 2019 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 18 Jun 2019 — REGISTERED-PRINCIPAL REGISTER
- 19 Apr 2019 — NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
- 03 Apr 2019 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 03 Apr 2019 — NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
- 02 Apr 2019 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 02 Apr 2019 — PUBLISHED FOR OPPOSITION
- 29 Mar 2019 — NOTIFICATION PROCESSED BY IB
- 13 Mar 2019 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 13 Mar 2019 — NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB