OCTAUNIVERSAL
Live / Registered — Registered — partial invalidation of extension of protection (as of 28 Jan 2025)
What this means for you
Registered since 07 Aug 2018. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79218098
- Registration number
- 5532395
- Mark type
- Stylized text
- Filed
- 01 Aug 2017
- Published for opposition
- 22 May 2018
- Registered
- 07 Aug 2018
- Attorney of record
- Jeffrey D. Sanok
Goods and services
- Class 006 — Metal goods: Components of metal for trade fair and exhibition stands, for shop fittings and for clean room walls, floors and ceilings, namely, decorative panels, wall, floor and ceiling panels, supports, profiled connectors and turnbuckles, mouldings, doors and door frames; metal moveable partition panels for dividing rooms
- Class 011 — Environmental control apparatus: Electric luminaires, LED lighting strips
- Class 019 — Non-metallic building materials: Components, not of metal, for trade fair and exhibition stands, for shop fittings and for clean room walls, floors and ceilings, namely, decorative panels, wall, floor and ceiling panels, supports, profiled connectors, mouldings, doors and door frames, fabric coverings
- Class 037 — Building construction and repair services: [ Construction of trade fair and exhibition stands, of shop fittings and clean rooms, including installation of electric light and power systems, monitor screens, display devices and feed air and exhaust air installations ]
Owner
Prosecution history
- 18 Mar 2026 — PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB
- 18 Mar 2026 — INVALIDATION PROCESSED
- 28 Sept 2025 — PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED
- 28 Jan 2025 — NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED
- 28 Jan 2025 — REGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK.
- 27 Jan 2025 — CASE ASSIGNED TO POST REGISTRATION PARALEGAL
- 19 Jul 2024 — TEAS SECTION 71 & 15 RECEIVED
- 07 Aug 2023 — COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
- 07 Dec 2018 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 19 Nov 2018 — FINAL DISPOSITION NOTICE SENT TO IB
- 19 Nov 2018 — FINAL DISPOSITION PROCESSED
- 07 Nov 2018 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 07 Aug 2018 — REGISTERED-PRINCIPAL REGISTER
- 02 Jun 2018 — NOTIFICATION PROCESSED BY IB
- 22 May 2018 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED