POWERVIA
Live / Registered — Cancelled — Section 71 (as of 31 Jan 2025)
What this means for you
Registered since 17 Jul 2018. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79213720
- Registration number
- 5516055
- Mark type
- Stylized text
- Filed
- 19 May 2017
- Published for opposition
- 01 May 2018
- Registered
- 17 Jul 2018
Goods and services
- Class 019 — Non-metallic building materials: Bituminous building products and coatings for soils and road pavements, bituminous binders for road construction and maintenance; bituminous coatings; paving blocks and slabs, not of metal
- Class 037 — Building construction and repair services: Construction, maintenance and repair of roads, traffic lanes, civil engineering structures, road infrastructures, bridges, platforms, sidewalks and any type of road surface; information relating to construction of roads, traffic lanes, civil engineering structures, road infrastructures, bridges, platforms, sidewalks and any type of road surface; asphalting
- Class 042 — Scientific and technological services: Design of roads, traffic lanes, civil engineering structures, bridges, platforms, sidewalks, car parks and any type of road surface; scientific and technical research; research and development of new products for others; construction drafting services; environmental protection-related research
Owner
- VINCI CONSTRUCTION, FR
- EUROVIA, FR
- EUROVIA, FR
- EUROVIA, FR
Prosecution history
- 22 Mar 2026 — TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB
- 22 Mar 2026 — INVALIDATION PROCESSED
- 30 Sept 2025 — TOTAL INVALIDATION OF REG EXT PROTECTION CREATED
- 31 Jan 2025 — CANCELLED SECTION 71
- 31 Jan 2025 — CHANGE OF NAME/ADDRESS REC'D FROM IB
- 16 Nov 2018 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 29 Oct 2018 — FINAL DISPOSITION NOTICE SENT TO IB
- 29 Oct 2018 — FINAL DISPOSITION PROCESSED
- 17 Oct 2018 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 17 Jul 2018 — REGISTERED-PRINCIPAL REGISTER
- 01 May 2018 — PUBLISHED FOR OPPOSITION
- 27 Apr 2018 — NOTIFICATION PROCESSED BY IB
- 11 Apr 2018 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 11 Apr 2018 — NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
- 11 Apr 2018 — NOTICE OF PUBLICATION