UIF
Live / Registered — Cancelled — Section 71 (as of 18 Oct 2024)
What this means for you
Registered since 03 Apr 2018. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79211414
- Registration number
- 5435567
- Mark type
- Stylized text
- Filed
- 31 Mar 2017
- Published for opposition
- 16 Jan 2018
- Registered
- 03 Apr 2018
- Attorney of record
- William J. Cassin
Goods and services
- Class 011 — Environmental control apparatus: Polymerization installations, namely, containers and reactors in the form of industrial furnaces, namely, pressure vessels and high-pressure reactors for use with polymerization reactions, for producing polyethylene, for generating synthesis gas, for solid, liquid, steam, gas, and catalytic reforming processes, and for synthesizing ammonia and urea
- Class 037 — Building construction and repair services: Maintenance of chemical installations in the nature of chemical processing machines; construction of polymerization installations, namely, customizing machines in the nature of containers and reactors in the form of industrial furnaces, namely, pressure vessels and high-pressure reactors for use with polymerization reactions, for producing polyethylene, for generating synthesis gas, for solid, liquid, steam, gas and catalytic reforming processes, and for synthesizing ammonia and urea
- Class 042 — Scientific and technological services: Engineering, in particular planning of polymerization installations in the field of process technology for polymerization processes
Owner
Prosecution history
- 10 Sept 2026 — CHANGE OF OWNER RECEIVED FROM IB
- 01 Jan 2026 — TOTAL INVALIDATION PROCESSED BY THE IB
- 13 Nov 2025 — GENERIC MADRID TRANSACTION SENT TO IB
- 13 Nov 2025 — GENERIC MADRID TRANSACTION CREATED
- 18 Jun 2025 — TOTAL INVALIDATION OF REG EXT PROTECTION CREATED
- 18 Oct 2024 — CANCELLED SECTION 71
- 03 Apr 2023 — COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
- 04 Aug 2018 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 10 Jul 2018 — FINAL DISPOSITION NOTICE SENT TO IB
- 10 Jul 2018 — FINAL DISPOSITION PROCESSED
- 03 Jul 2018 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 03 Apr 2018 — REGISTERED-PRINCIPAL REGISTER
- 03 Feb 2018 — NOTIFICATION PROCESSED BY IB
- 16 Jan 2018 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 16 Jan 2018 — PUBLISHED FOR OPPOSITION