CEMT
Live / Registered — Registered — Section 71 accepted (as of 22 Nov 2024)
What this means for you
Registered since 06 Feb 2018. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79197047
- Registration number
- 5393263
- Mark type
- Design + words
- Filed
- 28 Mar 2016
- Published for opposition
- 21 Nov 2017
- Registered
- 06 Feb 2018
- Attorney of record
- Chinhwei Chen
Goods and services
- Class 007 — Machines and machine tools: [ Blowing machines for the compression, exhaustion and transport of gases; ] machine equipment for bicycle industry, namely, bicycle assembling machines; [ machine equipment for the ceramic industry, namely, ceramic machinery for use in construction, namely, ceramic tools in the nature of milling cutters and machines for manufacturing ceramics; ] engraving machines; machines for the battery industry, namely, machines and tools in the nature of assembly line machines including machines used to make batteries, namely machines for enveloping, stacking, hole punching, short circuit testing, welding, heat sealing, testing, coding, and conveyors for assembling and packing batteries in the battery industry; packing machines; [ material processing and packing machines for use in pharmaceutical industry; plastic pouring machines; sulfuric acid manufacturing equipment; ] metalworking machines
Owner
- Jiangsu CEMT Energy Equipment Co., Ltd., Nanjing, Jiangsu, CN
- Jiangsu CEMT Energy Equipment Co., Ltd., CN
- Jiangsu CEMT Energy Equipment Co., Ltd., CN
Prosecution history
- 05 Feb 2026 — PARTIAL INVALIDATION PROCESSED BY THE IB
- 18 Jan 2026 — PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB
- 18 Jan 2026 — INVALIDATION PROCESSED
- 22 Jul 2025 — PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED
- 22 Nov 2024 — NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED
- 22 Nov 2024 — REGISTERED-SEC.71 ACCEPTED
- 08 Nov 2024 — TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED
- 08 Sept 2024 — PROOF OF USE INTERIM ACTION ISSUED
- 25 Aug 2024 — TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED
- 26 Feb 2024 — OFFICE ACTION ISSUED POU1
- 21 Feb 2024 — CASE ASSIGNED TO POST REGISTRATION PARALEGAL
- 06 Feb 2024 — TEAS SECTION 71 RECEIVED
- 06 Feb 2023 — COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
- 23 Jun 2018 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 16 May 2018 — FINAL DISPOSITION PROCESSED