UBBINK CENTROTHERM GROUP
Dead / Abandoned — Abandoned — failure to respond (as of 30 Nov 2016)
What this means for you
This application is over — abandoned 07 Nov 2016. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.
Record
- Serial number
- 79184441
- Mark type
- Word mark
- Filed
- 14 Jan 2016
- Abandoned
- 07 Nov 2016
Goods and services
- Class 006 — Metal goods: Metal building materials; transportable buildings of metal; non-electric metal cables and wires; ironmongery; metal pipes
- Class 011 — Environmental control apparatus: Lighting, heating, steam generating, cooking, refrigerating, drying, ventilating and water supplying apparatus and sanitary installations; chimney and boiler flues; gas flue installations
- Class 019 — Non-metallic building materials: Building materials, not of metal; rigid pipes, not of metal, for building; asphalt, pitch and bitumen; transportable buildings, not of metal; pipes (not of metal) for air and gas inlet and outlet; pipes (not of metal) for discharge of smoke from chimneys; ventilation ducts, not of metal
- Class 037 — Building construction and repair services: Construction services; repairs and maintenance of systems and installations on the products listed in class 11 and 19; installation of the products mentioned in class 11 and 19
Owner
- Ubbink B.V., XP
Prosecution history
- 16 Apr 2018 — CORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED
- 23 Feb 2018 — CORRECTION TRANSACTION RECEIVED FROM IB
- 15 Dec 2017 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 30 Nov 2017 — FINAL DISPOSITION NOTICE SENT TO IB
- 30 Nov 2017 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 01 Sept 2017 — NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
- 16 Aug 2017 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 16 Aug 2017 — NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
- 30 Nov 2016 — ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
- 30 Nov 2016 — ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
- 19 May 2016 — REFUSAL PROCESSED BY IB
- 04 May 2016 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 04 May 2016 — REFUSAL PROCESSED BY MPU
- 04 May 2016 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 03 May 2016 — NON-FINAL ACTION WRITTEN