GRAZIOLI
Dead / Abandoned — Abandoned — failure to respond (as of 03 Oct 2016)
What this means for you
This application is over — abandoned 08 Sept 2016. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.
Record
- Serial number
- 79182995
- Mark type
- Word mark
- Filed
- 02 Nov 2015
- Abandoned
- 08 Sept 2016
Goods and services
- Class 007 — Machines and machine tools: Metal forming machines; cutting machines for metalworking; tube end-forming machines; tube cutting machines; tube bending machines; welding machines; industrial cleaning machines for metalworking finished and semi-finished products; organic manure spreading machines and parts thereof; hydraulic reducers; gear boxes other than for land vehicles; shredders for sewage spreaders; transmission shafts, other than for land vehicles; shaft couplings machines
- Class 037 — Building construction and repair services: Installation, maintenance and repair of metal forming machines, cutting machines for metalworking, tube end-forming machines, tube cutting machines, tube bending machines, welding machines, industrial cleaning machines for metalworking finished and semi-finished products, organic manure spreading machines and parts thereof, hydraulic reducers, gear boxes other than for land vehicles, shredders for sewage spreaders, transmission shafts, other than for land vehicles, shaft couplings machines; rolls balancing
Owner
Prosecution history
- 30 Nov 2025 — NEW REPRESENTATIVE AT IB RECEIVED
- 20 Oct 2017 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 03 Oct 2017 — FINAL DISPOSITION NOTICE SENT TO IB
- 03 Oct 2017 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 04 Aug 2017 — NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
- 19 Jul 2017 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 19 Jul 2017 — NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
- 03 Oct 2016 — ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
- 03 Oct 2016 — ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
- 26 Mar 2016 — REFUSAL PROCESSED BY IB
- 07 Mar 2016 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 07 Mar 2016 — REFUSAL PROCESSED BY MPU
- 05 Mar 2016 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 04 Mar 2016 — NON-FINAL ACTION WRITTEN
- 24 Feb 2016 — ASSIGNED TO EXAMINER