GIO-PE
Dead / Abandoned — Abandoned — failure to respond (as of 11 Aug 2016)
What this means for you
This application is over — abandoned 15 Jul 2016. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.
Record
- Serial number
- 79178171
- Mark type
- Stylized text
- Filed
- 18 Sept 2015
- Abandoned
- 15 Jul 2016
Goods and services
- Class 042 — Scientific and technological services: Engineering, design, modelling, testing, monitoring, inspection, evaluation, surveying, technical verification, validation, supervision and engineering project management services relating to oil and gas production, oil and gas well treatment, oil and gas well fracturing and stimulation, oil and gas well completion and oil and gas well perforation; quality control and quality assurance services relating to relating to oil and gas production, oil and gas well treatment, oil and gas well fracturing and stimulation, oil and gas well completion and oil and gas well perforation; inspection, testing, analysis and evaluation of services and equipment relating to oil and gas production, oil and gas well treatment, oil and gas well fracturing and stimulation, oil and gas well completion and oil and gas well perforation for the purposes of certification; information, advisory and consultancy services in relation to all of the aforesaid
Owner
- Christopher Green, GB
- eFrac Ltd, GB
Prosecution history
- 25 Sept 2025 — NEW REPRESENTATIVE AT IB RECEIVED
- 01 Nov 2018 — CHANGE OF OWNER RECEIVED FROM IB
- 15 Sept 2017 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 11 Aug 2017 — FINAL DISPOSITION NOTICE SENT TO IB
- 11 Aug 2017 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 26 May 2017 — NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
- 10 May 2017 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 10 May 2017 — NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
- 11 Aug 2016 — ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
- 11 Aug 2016 — ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
- 01 Feb 2016 — REFUSAL PROCESSED BY IB
- 14 Jan 2016 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 14 Jan 2016 — REFUSAL PROCESSED BY MPU
- 13 Jan 2016 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 12 Jan 2016 — NON-FINAL ACTION WRITTEN