FIMA AHEAD OF THE FLOW

Dead / Abandoned — Abandoned — failure to respond (as of 05 Sept 2013)

What this means for you

This application is over — abandoned 08 Aug 2013. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.

Record

Serial number
79121043
Mark type
Design + words
Filed
08 Oct 2012
Abandoned
08 Aug 2013

Goods and services

  • Class 007 — Machines and machine tools: Fans, being parts for machines, in particular axial fans, radial fans, crossflow fans, chemical fans, process fans, draught fans, vacuum fans, circulation fans, exhaust fans, regeneration gas fans, turbo fans, circulating fans, flue gas fans and airflow fans; compactors (machines), in particular air compressors, turbo compactors, process gas compressors and vapour seals; compressors (machines); centrifuges and centrifugal mixers; valves (parts of machines), in particular blow-off valves, bottom valves; centrifugal dryers (machine)
  • Class 009 — Scientific and electric apparatus: Frequency converters, electric transformers, electric soft starters; machine monitoring apparatus, in particular pre-swirl regulators, diffusers, compensators, pump limiters, vibration, temperature, axial position and revolution counters and regulators

Owner

Prosecution history

  • 27 Oct 2022 — INTERNATIONAL REGISTRATION RENEWED
  • 25 Sept 2014 — FINAL DECISION TRANSACTION PROCESSED BY IB
  • 05 Sept 2014 — FINAL DISPOSITION NOTICE SENT TO IB
  • 05 Sept 2014 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
  • 22 May 2014 — NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
  • 07 May 2014 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
  • 07 May 2014 — NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
  • 05 Sept 2013 — ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
  • 05 Sept 2013 — ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
  • 27 Feb 2013 — REFUSAL PROCESSED BY IB
  • 07 Feb 2013 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
  • 07 Feb 2013 — REFUSAL PROCESSED BY MPU
  • 07 Feb 2013 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
  • 06 Feb 2013 — NON-FINAL ACTION WRITTEN
  • 06 Feb 2013 — ASSIGNED TO EXAMINER

View this trademark record on Marksy