HPP
Live / Registered — International registration cancelled — extension of protection cancelled (as of 29 Nov 2021)
What this means for you
Registered since 29 Jan 2013. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79109520
- Registration number
- 4281211
- Mark type
- Word mark
- Filed
- 29 Nov 2011
- Published for opposition
- 13 Nov 2012
- Registered
- 29 Jan 2013
- Attorney of record
- Nicholas D. Wells
Goods and services
- Class 037 — Building construction and repair services: Construction of buildings; construction repair in the field of monument conservation
- Class 042 — Scientific and technological services: Engineering; full construction project design services, namely, design for others in the fields of engineering, architecture, and construction drafting; design planning services, namely, interior design services, and consultancy related thereto; construction planning services and consultancy relating thereto; technical project studies, namely, conducting feasibility studies for architectural projects; technical project management in the field of engineering, architectural design, and construction of urban infrastructure, office buildings, and other buildings for public use; architectural design; architectural planning and consultancy services
Owner
Prosecution history
- 26 Jun 2022 — NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED
- 26 Jun 2022 — DEATH OF INTERNATIONAL REGISTRATION
- 29 Jan 2022 — COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED
- 30 Nov 2018 — NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED
- 30 Nov 2018 — REGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK.
- 29 Nov 2018 — CASE ASSIGNED TO POST REGISTRATION PARALEGAL
- 05 Nov 2018 — TEAS SECTION 71 & 15 RECEIVED
- 29 Jan 2018 — COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
- 25 Jan 2018 — CHANGE OF OWNER RECEIVED FROM IB
- 08 Jan 2016 — TEAS CHANGE OF CORRESPONDENCE RECEIVED
- 19 May 2013 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 01 May 2013 — FINAL DISPOSITION NOTICE SENT TO IB
- 01 May 2013 — FINAL DISPOSITION PROCESSED
- 29 Apr 2013 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 29 Jan 2013 — REGISTERED-PRINCIPAL REGISTER