SWITCHES PLUS
Dead / Abandoned — International registration dead — extension of protection cancelled (as of 08 Dec 2019)
What this means for you
This application is over — abandoned 08 Dec 2019. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.
Record
- Serial number
- 79079607
- Mark type
- Design + words
- Filed
- 07 Dec 2009
- Abandoned
- 08 Dec 2019
Goods and services
- Class 009 — Scientific and electric apparatus: Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, namely commutators, control and signalling apparatus, failure signals, static converters for functional systems, current units, relays, electric apparatus for commutation, control panels, insulating components, distribution boxes, distribution consoles, distribution boards, accessories for electric switches, telerupters, time switch, current rectifiers, transformers, auto circuit-breaker, apparatus for remote monitoring, verifying and control of industrial activities, connectors, apparatus for operating engines and machines by monitoring the current; signalling and monitoring apparatus
Owner
- EAO Holding AG, CH
Prosecution history
- 29 Aug 2020 — NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED
- 28 Aug 2020 — DEATH OF INTERNATIONAL REGISTRATION
- 18 May 2012 — NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
- 25 Nov 2011 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 10 Nov 2011 — FINAL DISPOSITION NOTICE SENT TO IB
- 08 Nov 2011 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 24 Aug 2011 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 24 Aug 2011 — NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
- 08 Nov 2010 — ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
- 08 Nov 2010 — ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
- 07 May 2010 — REFUSAL PROCESSED BY IB
- 29 Mar 2010 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 29 Mar 2010 — REFUSAL PROCESSED BY MPU
- 27 Mar 2010 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 26 Mar 2010 — NON-FINAL ACTION WRITTEN