PARADIGMA
Dead / Abandoned — International registration dead — extension of protection cancelled (as of 02 Apr 2013)
What this means for you
This application is over — abandoned 02 Apr 2013. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.
Record
- Serial number
- 79055622
- Mark type
- Stylized text
- Filed
- 29 Nov 2007
- Abandoned
- 02 Apr 2013
Goods and services
- Class 007 — Machines and machine tools: Heat engines, particularly block-cast heat engines
- Class 009 — Scientific and electric apparatus: Hydrogen-production devices, particularly electrolysis devices (except for laboratory apparatus)
- Class 011 — Environmental control apparatus: Air conditioning and ventilation devices as well as sanitary installations, lighting installations; water pipe parts, heating systems, particularly those using solar energy technology and/or heat pumps; heat recovery devices, mainly consisting of ventilation devices including an exhaust heat exchanger; household power supply and disposal devices, namely hybrid storage modules, fuel cells; small mechanical and biological devices for water purification, particularly gray water purification
- Class 019 — Non-metallic building materials: Tanks for collecting rainwater comprising concrete and plastic elements
Owner
Prosecution history
- 20 Oct 2013 — DEATH OF INTERNATIONAL REGISTRATION
- 09 Apr 2010 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 08 Mar 2010 — FINAL DISPOSITION NOTICE SENT TO IB
- 06 Mar 2010 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 21 Jan 2010 — NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
- 04 Jan 2010 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 31 Dec 2009 — NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
- 11 Jun 2009 — CHANGE OF OWNER RECEIVED FROM IB
- 06 Mar 2009 — ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
- 06 Mar 2009 — ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
- 22 Aug 2008 — REFUSAL PROCESSED BY IB
- 07 Aug 2008 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 07 Aug 2008 — REFUSAL PROCESSED BY MPU
- 06 Aug 2008 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 05 Aug 2008 — NON-FINAL ACTION WRITTEN