Serial 79051776
Live / Registered — Registered — Section 71 accepted (as of 30 Jul 2018)
What this means for you
Registered since 10 Mar 2009. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79051776
- Registration number
- 3587379
- Mark type
- Design / logo
- Filed
- 24 Jan 2008
- Published for opposition
- 23 Dec 2008
- Registered
- 10 Mar 2009
- Attorney of record
- Purvi Patel Albers
Goods and services
- Class 019 — Non-metallic building materials: Asphalt, pitch and bitumen; concrete sleepers, namely, concrete sleepers for tracks and points; concrete building materials, namely, blocks, bricks, posts, slabs and panels; railway sleepers, not of metal, posts, not of metal, namely, posts for power lines; rigid pipes, not of metal for building; posts, not of metal; cement slabs; non-luminous and non-mechanical signs not of metal; non-metallic transportable buildings
- Class 037 — Building construction and repair services: Building construction; building and construction of rail-track systems, namely, ballasted track systems and ballastless track systems on concrete and asphalt covers; installation services, namely, installation of rail tracks and track systems; machinery installation, maintenance and repair; repair of tracks and railways
Owner
- PCM RAIL.ONE AG, DE
- PCM RAIL.ONE AG, DE
- RAIL.ONE GmbH, Neumarkt, DE
- RAIL.ONE GmbH, DE
- RAIL.ONE GmbH, DE
Prosecution history
- 13 Nov 2025 — NEW REPRESENTATIVE AT IB RECEIVED
- 30 Jul 2018 — NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED
- 30 Jul 2018 — REGISTERED-SEC.71 ACCEPTED
- 17 Jul 2018 — TEAS SECTION 71 RECEIVED
- 10 Mar 2018 — COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED
- 15 Feb 2018 — INTERNATIONAL REGISTRATION RENEWED
- 11 Dec 2017 — CHANGE OF OWNER RECEIVED FROM IB
- 20 Nov 2017 — CHANGE OF OWNER RECEIVED FROM IB
- 21 Aug 2014 — NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED
- 21 Aug 2014 — REGISTERED-SEC.71 ACCEPTED
- 21 Aug 2014 — CASE ASSIGNED TO POST REGISTRATION PARALEGAL
- 07 Aug 2014 — TEAS SECTION 71 RECEIVED
- 12 Jan 2013 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 25 Jun 2009 — FINAL DISPOSITION NOTICE SENT TO IB
- 25 Jun 2009 — FINAL DISPOSITION PROCESSED