RAIL.ONE
Live / Registered — Registered — Section 71 accepted (as of 26 Jul 2018)
What this means for you
Registered since 26 Aug 2008. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79038795
- Registration number
- 3492838
- Mark type
- Stylized text
- Filed
- 22 Nov 2006
- Published for opposition
- 10 Jun 2008
- Registered
- 26 Aug 2008
- Attorney of record
- Purvi Patel Albers
Goods and services
- Class 019 — Non-metallic building materials: Asphalt, pitch and asphalt bitumen; concrete sleepers, concrete rail sleepers and concrete rail point sleepers; concrete building materials, namely, blocks, bricks, posts, slabs and panels; railway sleepers, not of metal; rigid pipes, not of metal; posts, not of metal; cement slabs; non-luminous and non-mechanical signs, not of metal; transportable buildings, not of metal
- Class 037 — Building construction and repair services: Building construction; building and construction of rail-track systems, namely, ballastless track systems on concrete and asphalt surfaces; installation of rail tracks and track systems; installation, maintenance and repair of machines; repair of rail tracks and track systems
Owner
- PCM RAILONE AG, DE
- PCM RAIL.ONE AG, DE
- RAIL.ONE GmbH, Neumarkt, DE
- RAIL.ONE GmbH, DE
- RAIL.ONE GmbH, DE
Prosecution history
- 13 Nov 2025 — NEW REPRESENTATIVE AT IB RECEIVED
- 27 Jan 2023 — CHANGE OF NAME/ADDRESS REC'D FROM IB
- 26 Jul 2018 — NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED
- 26 Jul 2018 — REGISTERED-SEC.71 ACCEPTED
- 17 Jul 2018 — TEAS SECTION 71 RECEIVED
- 11 Dec 2017 — CHANGE OF OWNER RECEIVED FROM IB
- 20 Nov 2017 — CHANGE OF OWNER RECEIVED FROM IB
- 26 Aug 2017 — COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED
- 29 Dec 2016 — INTERNATIONAL REGISTRATION RENEWED
- 20 Aug 2014 — NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED
- 20 Aug 2014 — REGISTERED-SEC.71 ACCEPTED
- 20 Aug 2014 — CASE ASSIGNED TO POST REGISTRATION PARALEGAL
- 07 Aug 2014 — TEAS SECTION 71 RECEIVED
- 30 Dec 2012 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 17 Dec 2008 — FINAL DISPOSITION NOTICE SENT TO IB