THE MUD-GAS PRESSURE CONTROL EXPERTS

Dead / Cancelled — Cancelled — Section 8 (as of 15 Apr 2016)

What this means for you

This registration has been cancelled; it no longer blocks anyone on its own. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.

Record

Serial number
77420042
Registration number
3681664
Mark type
Stylized text
Filed
12 Mar 2008
Registered
08 Sept 2009
Attorney of record
Michael J. LaBrie

Goods and services

  • Class 007 — Machines and machine tools: Centrifugal pumps; petroleum industry power-operated equipment for drilling fluid processing and solids control, namely, shakers; power operated pressure control equipment for use in drilling oil, namely, chokes and degassers for extracting gas from fluid during oil production and dual mud gas separators for horizontal drilling being components of manifolds
  • Class 011 — Environmental control apparatus: Ignition systems comprised of a gas supply tube with a nozzle and an electrical igniter to create a flame at the nozzle for oil and gas drilling and production operations, namely, for igniting waste gases being discharged from a well; mud gas separators, namely, separators for the cleaning and purification of drilling mud; gas extraction devices, namely, degasser of gas and extractors of liquid for use in extracting gases from drilling fluids; and pressure control equipment, namely, chokes and degassers for separating gas from fluid during oil production; power operated pressure control equipment for use in drilling oil, namely, chokes, and degassers for extracting gas from fluid during oil production and dual mud gas separators for horizontal drilling
  • Class 037 — Building construction and repair services: Rental of oil and gas well drilling, production and work-over equipment

Owner

Prosecution history

  • 15 Apr 2016 — CANCELLED SEC. 8 (6-YR)
  • 21 Feb 2013 — TEAS CHANGE OF CORRESPONDENCE RECEIVED
  • 08 Sept 2009 — REGISTERED-SUPPLEMENTAL REGISTER
  • 03 Aug 2009 — LAW OFFICE PUBLICATION REVIEW COMPLETED
  • 03 Aug 2009 — ASSIGNED TO LIE
  • 24 Jul 2009 — APPROVED FOR REGISTRATION SUPPLEMENTAL REGISTER
  • 14 Jul 2009 — EXAMINER'S AMENDMENT ENTERED
  • 14 Jul 2009 — NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
  • 14 Jul 2009 — EXAMINERS AMENDMENT E-MAILED
  • 14 Jul 2009 — EXAMINERS AMENDMENT -WRITTEN
  • 16 Jan 2009 — NOTIFICATION OF FINAL REFUSAL EMAILED
  • 16 Jan 2009 — FINAL REFUSAL E-MAILED
  • 16 Jan 2009 — FINAL REFUSAL WRITTEN
  • 23 Dec 2008 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 22 Dec 2008 — CORRESPONDENCE RECEIVED IN LAW OFFICE

View this trademark record on Marksy