PUMPCO ENERGY INFRASTRUCTURE
Live / Applied — New application — not yet assigned to an examiner (as of 15 Sept 2026)
What this means for you
Not registered yet, but its 15 Sept 2026 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 50110110
- Mark type
- Stylized text
- Filed
- 15 Sept 2026
- Attorney of record
- Manuel R. Valcarcel, Esq.
Goods and services
- Class 037 — Building construction and repair services: Pipeline construction; Pipeline maintenance; Pipeline installation and repair; Pipeline construction and maintenance services; Horizontal directional drilling for installing underground pipelines; Laying, repair, maintenance, replacement and refurbishment of pipelines; Construction project management in the nature of construction supervision; Mechanical contractor services; Electrical contractor services; Installation, maintenance and repair of pipelines, pipeline meter stations, pipeline pump stations, pipeline compressor stations, pipeline slug catchers, pipeline filter separators and pipeline electrical and mechanical equipment
Owner
- MasTec North America, Inc., Coral Gables, FL, US
Prosecution history
- 15 Sept 2026 — APPLICATION FILING RECEIPT MAILED
- 15 Sept 2026 — NEW APPLICATION ENTERED